Laserfiche WebLink
L <br /> Morita Brothers Service Ston 17 Manch 7, 1992 <br /> from the site. Sampling equipment shall be decontaminated before sampling and <br /> between sampling with washing with laboratory-grade detergent, a water rinse and <br /> a contaminant-free distilled water rinse. <br /> L <br /> EMERGENCY PROCEDURES <br /> LEmergency conditions are considered to exist if: <br /> * <br /> Any member of the field crew is involved in an accident, experiences any <br /> adverse effects or symptoms of exposure while on-site; or <br /> * A condition is discovered that suggests the existence of a situation more <br /> i hazardous than anticipated. <br /> In the event of an on-site emergency, the procedures described below are to be <br /> Limmediately followed. <br /> 1. Personnel on-site should use tate "buddy system" (stay in pairs). In the event of <br /> a communication breakdown, i.e. radio malfunction or if radios are not <br /> L available, "buddies" should use prearranged hand signals or other means of <br /> emergency signals as follows: <br /> L * Hand gripping throat - out of air, can't breath. <br /> * Grip partner's wrist or place both hands around waist - leave area <br /> Limmediately, no debatel <br /> * Hands on top of head - need assistance <br /> * Thumbs down - no, negative. <br /> 2. The field engineer or geologist will establish. emergency evacuation routes and <br /> will make all project personnel aware of these routes prior to the first on-site <br /> activities. In the event of an emergency, selection other escape route will be <br /> based on the nature of the emergency and wind direction. <br /> L <br /> L <br /> EB-8101-1 9203-B©16.WP <br />