Laserfiche WebLink
Moritz 11"I& rx Service Station 16 March 7, 1992 <br /> particle in the eye, the portable eyewash will be used to irrigate the eye for 15 <br /> Lminutes. If direct contact with contaminants occurs, affected skin areas should be <br /> washed immediately with soap and water. <br /> L <br /> At least one person at the site will have current certification in First Aid and CPR. <br /> L <br /> SITE LAYOUT <br /> L The level of hazard associated with the work to be performed does not require <br /> dividing the site into formal exclusion, contamination reduction, and support zones. <br /> However, care will be taken to avoid breathing vaporized gasoline fuel. <br /> CONTAMINATION MONITORING <br /> Organic vapor monitoring of the ambient air shalt be conducted at reasonable <br /> intervals as determined by project personnel. The purpose of monitoring is to <br /> Ldetermine if vapor levels in the work area are high enough to warrant personal <br /> protection measures or evacuation of the site. <br /> Organic vapor levels should be monitored using an OVM photoionization meter with <br /> an 11.7 eV lamp (probe), calibrated to benzene or a Foxboro® OVA (organic vapor <br /> analyzer) 108 flame-ionization detector calibrated for non-methane hydrocarbons. <br /> Background should be determined by taking readings before sampling begins. All <br /> readings, background and others, must be recorded, If any continuous measurement <br /> is observed to be 10 titres over background levels in the work area, respiratory <br /> protective action will be required. Lesser protective measures are at the field <br /> geologists or engineers discretion. <br /> DECONTAMINATION <br /> L Before leaving the site/work area, personnel must remove all protective equipment <br /> and wash their hands, faces and necks. These washing procedures shall be observed <br /> before all work breaks. <br /> To minimize the potential for cross-contamination, all excavation equipment shall be <br /> Ldecontaminated before the start of drilling, between borings, and before removal <br /> EB-8101-1 9203-E016.WP <br />