My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:27:36 PM
Creation date
3/5/2019 11:46:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Morita Brothers Service StY 4 March 7, 1992 <br /> L <br /> �r <br /> PURPOSE <br /> The purpose of this plan, which was developed specifically for operations at the <br /> Lreferenced site, is to assign responsibilities, establish personnel protection standards <br /> and mandatory safety procedures, and provide for contingencies that may arise <br /> Lwhile field operations associated investigating soil and groundwater are being <br /> conducted at the site. This plan complies with, but does not replace, Federal health <br /> ` and Safety Regulations as set forth in 29 CFR 1910 and 1926, California Health and <br /> Safety Regulations set forth In Title 8, California Code of Regulations, and guidance <br /> ` established by the California Department of Health Services. This plan is to be used <br /> Lby ESE as a supplement to such rules, regulations, and guidance. <br /> LAPPLICABILITY <br /> The provisions of the plan are mandatory for all on-site ESE employees engaged in <br /> Lactivities known to be or potentially associated with the presence of hazardous <br /> materials. These activities may include, but are not limited to, mobilization, project <br /> Loperations, and demobilization. <br /> f Changes and/or unanticipated site conditions may require modification of this Site <br /> LHealth and Safety Plan (SHSP) in order to maintain a safe work environment. Any <br /> proposed changes to this plan should be reviewed by the Corporate Health and Safety <br /> LOfficer of ESE, prior to their implementation. <br /> LIf this is not feasible, the project team leader may modify the plan and record all <br /> changes in the field log book. Under no circumstances will the plan modifications <br /> t conflict with Federal, state, or local health and safety regulations. <br /> L Under 29 CFR 1910.120 (b) (15) ESE is required to notify each subcontractor of the <br /> hazardous materials identified by ESE. The acceptance of such responsibility does not <br /> and shall not be deemed an acceptance of responsibility for any other health and <br /> safety requirements, such as those related to excavating, trenching, drilling or <br /> backfilling. Each subcontractor shall perform all work in accordance with a Site <br /> Health and Safety Plan for its employees, which covers any exposure to hazardous <br /> LEB-8101-1 9203-E016.WP <br />
The URL can be used to link to this page
Your browser does not support the video tag.