My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 2:07:09 PM
Creation date
3/5/2019 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technies Inc. t ` ,fj F�l <br /> 2741 River Road v �, <br /> 9Korlesto,CaCtfontia 95351 � 04 <br /> (209)538-6424/'FaX#538-5852 <br /> December 29, 2000 <br /> Project No.: 724.2 <br /> Project Name: . Morita Brothers (Charter) <br /> Ms. Linda Sanborn <br /> State Water Resources Control Board <br /> 2014 T Street, Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: Cost Pre-Approval for Soil and Water Disposal <br /> Location: Morita Brothers, 814 E. Charter Way, Stockton, CA <br /> County Site Code: 1061; USTCFP Claim #6793 <br /> Dear Ms. Sanborn: <br /> In a letter from San Joaquin County, dated May 3, 2000, M:1 s. Carol Oz requested that additional <br /> monitoring wells be installed to define the vertical and lateral extent of soil and groundwater <br /> contamination at the site, located at Morita Brothers, 814 E. Charter Way, Stockton, California. <br /> To accomplish this directive,,Geological Technics Inc. (GTI) prepared a work plan dated July 7, <br /> I 2000 with subsequent addenda regarding well placement and design issues. Ms. Oz approved <br /> the work plan on August 8, 2000 and the wells were subsequently installed on November 20- <br /> 22, 2000. <br /> At this time there are approximately twenty (20) 55-gallon drums of soil (drill cuttings) and <br /> seven (7) 55-gallon drums of well purge water. The work proposed here is just the arranging, <br /> coordinating, supervision and disposal of these drums of soil and water. <br /> Copies of the work plan and addendum's to the Work Plan, SJC PHS/EHD correspondence, <br /> disposal bids and an itemized budget spreadsheet of costs ,for performing this work is enclosed <br /> forY our review, <br /> Proposed Bidding of Project <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested bids from Del- <br /> Tech and NOR CAL OIL to dispose of the soil and water, respectively. <br /> These costs have been included in the attached opinion of cost spreadsheet prepared giving <br /> estimated costs for performing the work approved by SJC -PHS/EHD. The opinion of cost <br /> spreadsheet shows itemized cost for the tasks proposed'! In an attempt to make this Pre- <br /> Approval flow smoothly, GTI has used the same unit costs for this work that has previously <br /> been approved by the USTCFP for other projects. <br /> Geological Technics Inc. accepts field support services 'and lab invoices and adds a 15% <br /> overhead fee. GTI then pays these charges. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.