2. Plans will be drawn up for the project by our engineer and submitted to the City of Manteca Planning and Fire <br /> Departments for review. <br /> 3. Based upon the approved plans, we will order a new AST to be built. Upon delivery,the existing tank will be <br /> removed from operation and the new AST will be installed per the approved plans. <br /> 4. Both tanks will be grounded and have the correct emergency venting installed. <br /> We are anticipating this project could take as long as twelve months from start to finish by the time plans are prepared <br /> for submittal,the plan review process is completed and approved, a new tank is fabricated and the installation/final <br /> inspections are done.Aboveground Storage Tanks are custom built products and often take 12 or more weeks to be <br /> manufactured and delivered. <br /> Thank you in advance for your support as we move forward with this project, <br /> Jon Lorente <br /> Director of Compliance and Safety <br /> eFUEL, LLC <br /> Cell: (408)499-0336 <br /> 4605 E.Vine Avenue <br /> Fresno, CA 93725 <br /> 2 <br />