My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station # �S CCS:;( <br />Address <br />BP WEST COAST PRODUCTS LLC <br />MECHANICAL LEAK DETECTOR TEST DATA SHEET <br />Date 20 <br />TEST INFORMATION <br />Replaced All Failed Leak Detectors Yes No N/A <br />If No, Replacement To Be Completed By (Date) <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility according to the <br />equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. <br />The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician L �� _ Lic # rx3-6, <br />Signature 9::� <br />APC -3325 (9/02) <br />1 <br />2 <br />3 <br />4 <br />5 <br />Product <br />Manufacturer <br />A <br />Model <br />Full Operating Pressure (psi) <br />2 <br />Line Bleed Back (ml)90 <br />Trip Time (sec) <br />`-y <br />Metering Pressure (psi) <br />6 <br />F/E Holding Pressure (psi) <br />122 <br />Test Leak Rate (ml/min) (gph) <br />PASS or FAIL <br />Replaced All Failed Leak Detectors Yes No N/A <br />If No, Replacement To Be Completed By (Date) <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility according to the <br />equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. <br />The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician L �� _ Lic # rx3-6, <br />Signature 9::� <br />APC -3325 (9/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.