My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page ..3 of It <br />S. SECONDARY PIPE TESTING <br />Test Method Developed By: FJ Piping Manufacturer X Industry Standard O Professional Engineer <br />Cl Other (Sped) <br />Test Method Uses: X Pressure ❑ Vacuum U Hydrostatic <br />D Other (Specify) <br />Measuring Equipment (hied for <br />Piping Material- <br />Tcsting: 4 W' pressure gauge w/.25% accuracy <br />Piping Run # 1 87 <br />Piping Run # 91 <br />Piping Run 0 <br />N/A <br />N/A <br />N/A <br />Piping ManUIUCtUrer: <br />NIA <br />N/A <br />N/A <br />Piping Diameter: <br />N/A <br />N/A <br />N/A <br />Length of Piping Run: <br />N/A <br />N/A <br />N/A <br />Product Stored: <br />N/A <br />N/A <br />N/A <br />Method and location of <br />piping -run isolation: <br />N/A. <br />N/A. <br />N/A <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />N/A <br />N/A <br />N/A <br />Test Start Time: <br />N/A <br />N/A <br />N/A <br />Initial Reading (R,): <br />N/A <br />N/A <br />N/A <br />Test End 'time: <br />N/A <br />N/A <br />N/A <br />Final Reading (Rr): <br />N/A <br />N/A <br />N/A. <br />Tcsr Duration: <br />N/A <br />N/A <br />N/A <br />Change in Reading (RF -R,): <br />N/A <br />N/A <br />NIA <br />Pass/Fail Threshold: <br />N/A <br />N/A <br />N/A <br />Test Result: <br />N/A <br />N/A <br />N/A <br />Comments — (include information on repairs made to facilitare a passing rest and indicate whether u <br />permit wan obtained for the repairs) <br />,-,NQ ,LINES TESTED <br />Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br />which is generally consistent with testing performed at time of installation. <br />R.C.U.S_T_COM December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.