Laserfiche WebLink
Page y.. of (( <br />6. SUBMERSIBLE PUMP CONTAINMENT SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer X Industry Suuidard ❑ Prufcssional Engineer <br />Ll Other (Sped) <br />Test Method Uses: 0 Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Measuring Equipmcni Used for Testing: Inron T.V VTS <br />87 TURBINE STP 89 TURBINE STP 91. TURBINE STP <br />Sump Diameter: <br />42" <br />42" <br />42" <br />Sump Depth, <br />33" <br />33" <br />34" <br />Sump Material: <br />FIBL.KGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Highest <br />Piping Penetration: <br />1 <br />12^ <br />] 6^ <br />Height From "I'ank Top to Lowest <br />Electrical Penetration: <br />8" <br />6" <br />8" <br />Condition of sump prior to <br />FAIR <br />FAIR <br />FAIR <br />testin <br />Purtiun ufSump Tested. <br />2" ABOVE HIGHEST <br />2" ABOVE HIGHEST <br />2" ABOVE H_tGHEST <br />PENETRATION <br />PENETRATION <br />PENETRATION <br />Does turbine shut down when <br />sump scnsor detects either <br />YES <br />YES <br />YES <br />product or water? <br />Turbine shutdown response time. <br />INSTANT <br />INSTANT <br />MTANT <br />Is system programmed for fail- <br />YES <br />YES <br />YES <br />safe shutdown? <br />Was fail-safe verified to be <br />YI,S <br />YES <br />YES <br />operational? <br />Wait time between applying <br />pressure/vacuum/crater and <br />30 MINUTES <br />30 MINUTES <br />30 MINUTES <br />starting test: <br />Tc,4t Start Time: <br />1326/1342 <br />1305/1342 <br />1248/1305 <br />initial Rcading (RI): <br />3.31.90"/3.3172" <br />4.9788/4.9739" <br />5.14371/5.1433" <br />Test End Tune: <br />1341/1.357 <br />1320/1357 <br />'13(W]320 <br />Final Rcading (Rr): <br />33192"/33194" <br />4.9769^/4.9723" <br />5.1432"/5.1414" <br />Test. Duration: <br />15 MIIfNUTES/15 MINUTES <br />15 MllNUTES/15 MINUTES <br />15 MIINUTES/]5 MINUTE. <br />Changc in Rcading (Rr,-RI): <br />+0.0002"/+0.0002" <br />-0.0019"/-0.0016" <br />-0.0005"/-0.0019" <br />Pass/Fail Threshold: <br />+/-0.002" <br />+/-0.002" <br />+/4).002 - <br />Test Result: <br />PASS <br />PASS <br />PASS <br />Was sensor removO for testing? <br />YES <br />YES <br />YES <br />Was sensor properly replaced <br />after testing? <br />VES <br />YES <br />YES <br />Comments — (include information on repairs made topciArare a passing test and indicate whether a <br />permit was obtained for the repairs) <br />Tightened clamns on all entry bgots in all sumps. <br />Installed SSI onair-boots on electrical in all sur s. <br />Note: Hydrostatic testing of sumps should, at a minimum, provide for a liquid level that tests <br />the tank/saddle juncture and the highest tank piping system projection into the sump. <br />K.C.U,s.T.CoM <br />December 200 <br />