My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page ` 01- !( <br />8.. UIVDER,DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturcr X Industry Staadiu-d ❑ Prufcssional Engineer <br />❑ Other (Specify) <br />Test Method Uses: Li Pressure n Vacuum X Hydrostatic <br />❑ Other (S'peerf)) <br />Measuring Equipment Used for Testing Ancon TS -STS <br />UDC # tTDC # Ui)C # <br />UDC Manufacturer: <br />11DC Material: <br />UDC Depth: <br />Height ITom UDC Bottum to <br />Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of TYDC Tested. <br />Does turbine shut down when <br />ODC sensor detects either <br />induct or water? <br />Turbine shutdown response <br />time. <br />Is system programmed for fail- <br />safe shutdown? <br />Was fail -sate verificd to be <br />operational? <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time - <br />imeinitiallteadin <br />initial &eadin(1): <br />Tcst End Time: <br />Final.Readin (Rt.): <br />Test Duration: <br />Change in Reading RF -R,): <br />' <br />Pass/Fail Threshold_ <br />Te -0 Result: <br />Was sensor removed for <br />testing? <br />Was sensor properly replaced <br />_ <br />after testing? <br />Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br />Permit was obtained for the repairs) <br />Note: Hydrostatic testing of the UDC should, at a minimum, provide for a liquid level that tarts to <br />the highest point of piping projection into the containment vessel. <br />R.C.U.S.T.COm December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.