My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page .S of it <br />7. UNDER-llMSPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer X Industry Standard I: I Prolcssiunal Enytteer <br />❑ Other (Specify) <br />Test Method Uses: ❑ Pressure U vacuum X Hydrostatic <br />❑ Other (Specify) <br />Measuring Equipment Used for Testing Ancon T.S•STS <br />UAC # 11/12 UDC # UDC # <br />UDC Manufacturer, Unknown <br />UDC Material: <br />Poly <br />UDC Depth; <br />14" <br />Height from UDC Bottom to <br />7" <br />High Piping Penetration; <br />Height from ITDC Bottom to <br />On bottom <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Good <br />testing- <br />estin :Portion <br />Portionof UDC Tested. <br />2" above highest penetration <br />Does turbine shut down when <br />Yes <br />_ <br />IJDC sensor detects either <br />product or water? <br />Turbine shutdown response <br />Instunt <br />titue, <br />is system programmed for fail- <br />Yes <br />Safe shutdown? <br />Was fail-safe verified to be <br />Yes <br />operational? <br />Wait time between applying <br />30 Minutes <br />pressure/vacuum/water and <br />suutin , test: <br />'fest Start Tirue: <br />0938/0954 <br />Initial Reading (Rt): <br />4.1219"/4.1204" <br />"fest End Time: <br />0953/1009 <br />Final Reading (RR): <br />4.1205"/4.1201" <br />Test Duration: <br />15 Minutes/15 Minutes <br />Change in Reading R, -R, : <br />-0.0014"/-0.0003" <br />Pass/Fail Threshold: <br />+/-0.002" <br />Test Result: <br />Pass <br />Was sensor removed for <br />Yes <br />testing? <br />Was sensor properly replaced <br />Yes <br />after testing? <br />Comments — (include information on repairs made to facilitate a passing test and indicate whether a <br />permit was ohtainedfor the repairs) <br />Note: Hydrostatic testing of the UDC should, at a minimum, provide for a liquid level that tests to <br />the highest point of piping projection into the cuntaioment vessel. <br />R.C.U_S.T_COM <br />December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.