Laserfiche WebLink
05?15J2001 03:14 0000, 300 <br />Yor <br />IL Remove U4 -inch pipe plug from tank test port in <br />the Packer (on 6 -inch Big -Flo applications, re- <br />mave the 1/4 -inch pipe plug from the riser/flange <br />as�embly).- <br />b. Apply a UL-claaaified aon-tonic pipe thxead seal- <br />ant to the 1/4 -inch NFT 46 -degree elbow and <br />SHIELDS, H; RF a CO. <br />P -GE 05 <br />9 ..., <br />the enclosed decals to the dirpenzerdial. ¢iaeaag..'.. <br />g ode of gas,nl"a UPaa: WI ic3s- -this .leak detector. ii, . <br />being'iaa sd=: Addadonabdecals. sre available; c22--� <br />_ �z�aeser�^l�aC1=t3QQ:�.E3348or1919) 498-5708:.:...,;:•, ; -. <br />10: Inspecta(1 threaded joints to assure theYare.tight ami> - _::.:: <br />not )ealcng. ' <br />Install rn tank teat port of the packer. On 6 -inch Test of the Leak Detector <br />Sig -Flo a li ti *1. <br />pp ca one, a L4 -Inch NPT 45 -degree <br />elbow may be insta erd into the riser/flange U.S. Environmental Protection Agency (EPA) regulations re- <br />assembly quire annual veridcation of operation of leak detector. To <br />c. Inatall a IJ4-inch NPT tee on the 45 -degree elbow assure maintenance of leak detection capability, Red Jacket <br />-that is in the tank teat port (or an 6 -inch Big -Flo requires. that. operation of the mechan6cal,.1ea1 _datec=or,be. <br />riser/flange assembly) to accommodate both the verified by teitihk upon start-up sad_tli testing of:the hIak <br />vent tube and snap tap. detector.be peifatm d routinely at least annually.. - <br />d. Apple a Ul-claasi$ed non-toxic pipe thread seal- <br />ant to the threads of the 1/4 -inch NPT 9p -.degree • <br />elbow vent tube titling and install in the. tee. <br />e. Apply a UL -Classified non-toxic pipe thread seal- <br />ant to the threads of the 1/4 -inch NPT straight <br />vent tube fitting and install in the leak detector <br />vent opening in the cap of the leak detector. <br />f. Install the vent tubing into both fittings and <br />tighten. <br />g. To install snap tap connectors in FX2V/F=DV <br />models, apply a LTL- lassiEsd non-toxic pipe <br />thread sealant to the snap tap connectors and <br />install one in the body of the FXV leak detector <br />and the otherin the tee attached to the 45 -degree <br />elbow installed inth —1,— t <br />Test procedure options for mechanical <br />ea <br />lk deuton are explained inR.ed Jacket <br />Engineerin9Reporta,RJ20 aadRJ21.The <br />Red Jacket Snap Tap connectors allow <br />the Fit V/FX <br />