My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` Monitor Certification Inspection <br />"ARCO Products Company <br />This letter certifies that the monitor(s) is/are in place, the probes are in correct position and the system <br />is operating properly. <br />Station # SV6 2 Date o <br />Address T—(='� �Sd e Type Inspection: <br />Annual t Permit <br />Recheck Leak <br />Type & Model of Monitor /'-NJ — <br />System Function <br />Tanks Annular Space <br />Pans Fail N/A <br />Regular <br />Midgrade — <br />Supreme <br />Waste Oil <br />Other <br />In Tank <br />Pass- Fail N/A <br />Product Lines Turbine Sump In -Line Fill Sump <br />Pass Fail N/A Pais Fail N/A Pass Fail N/A <br />Regular <br />Midgrade <br />Supreme <br />Waste Oil —� <br />Other —_ <br />When monitor is turned off or in alarm, is there positive shutdown of turbines? Yes __/_ No <br />If No, were precision product line tests performed? Yes No <br />Monitor Panel <br />Is the monitor panel mounted and labeled correctly? <br />Does monitor alarm horn function properly? l' <br />1-1 <br />Is panel accessible and visible to station personnel? <br />Replaced all failed probes? Yes No N/A _V_ <br />?,5b. <br />If No, probes to be replaced/repaired by (Date) <br /><7 7 l �,J. t i i{ '���J �� �' a CiCe ` l_.� i� Y� 1 <br />Di 5p-en-3or–/jeu— <br />'s'-e" cc S ��S Jj <br />Inspected By: Contractor t_. <br />Technician�- <br />Signature J <br />APC -3324 (W%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.