Laserfiche WebLink
` Monitor Certification Inspection <br />"ARCO Products Company <br />This letter certifies that the monitor(s) is/are in place, the probes are in correct position and the system <br />is operating properly. <br />Station # SV6 2 Date o <br />Address T—(='� �Sd e Type Inspection: <br />Annual t Permit <br />Recheck Leak <br />Type & Model of Monitor /'-NJ — <br />System Function <br />Tanks Annular Space <br />Pans Fail N/A <br />Regular <br />Midgrade — <br />Supreme <br />Waste Oil <br />Other <br />In Tank <br />Pass- Fail N/A <br />Product Lines Turbine Sump In -Line Fill Sump <br />Pass Fail N/A Pais Fail N/A Pass Fail N/A <br />Regular <br />Midgrade <br />Supreme <br />Waste Oil —� <br />Other —_ <br />When monitor is turned off or in alarm, is there positive shutdown of turbines? Yes __/_ No <br />If No, were precision product line tests performed? Yes No <br />Monitor Panel <br />Is the monitor panel mounted and labeled correctly? <br />Does monitor alarm horn function properly? l' <br />1-1 <br />Is panel accessible and visible to station personnel? <br />Replaced all failed probes? Yes No N/A _V_ <br />?,5b. <br />If No, probes to be replaced/repaired by (Date) <br /><7 7 l �,J. t i i{ '���J �� �' a CiCe ` l_.� i� Y� 1 <br />Di 5p-en-3or–/jeu— <br />'s'-e" cc S ��S Jj <br />Inspected By: Contractor t_. <br />Technician�- <br />Signature J <br />APC -3324 (W%) <br />