My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2000 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:46:00 PM
Creation date
3/6/2019 11:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2004
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'A �& <br />"ARCO Products Company <br />Station # �J (2 <br />Address <br />t <br />Mechanical Leak Detector Test Data Sheet <br />Date 19 <br />Test Information <br />T <br />Replaced All Failed Leak Detectors Yes No ' ` N/A- <br />If <br />/A_If No, Replacement To Be Completed By (Date) % / / / UO <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. �}— <br />Inspected By: Contractor <br />TechnicianLic# <br />Signature <br />APC -3325 (at%) <br />I <br />1 <br />2 <br />3 <br />4 <br />5 <br />Product <br />Manufacturer, <br />_ � -_ <br />0 V`\ <br />6,1 <br />Model <br />C—r- <br />Lb 2, <br />'6, D (VO <br />Full Operating Pressure (psi) <br />2 <br />Line Bleed Back (nil) <br />65) 4— <br />Trip Time (sec) <br />JD <br />2 —3fVC <br />Metering Pressure (psi) <br />F/E Holding Pressure (psi) <br />S <br />Test Leak Rate (ml/min) (g -ph) <br />PASS or FAEL <br />T <br />Replaced All Failed Leak Detectors Yes No ' ` N/A- <br />If <br />/A_If No, Replacement To Be Completed By (Date) % / / / UO <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The mechanical leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. �}— <br />Inspected By: Contractor <br />TechnicianLic# <br />Signature <br />APC -3325 (at%) <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.