16 April 1997 <br /> AGE-NC Project No . 95 -0121 <br /> Page 6 of 9 <br /> 3 . 2 . 2, PROPOSED IN-SITU AIR SPARG [NG SYSTEM LOCATION AND DESIGN <br /> The IAS compressor will operate independently from the SVE unit . This %w ill allow for control of the <br /> air flow to the sparge points and "surging' of the IAS system, if necessary, to prevent mounding <br /> and/or migration of the dissolved hydrocarbons . A separate electrical source and meter will be <br /> J necessary for the [AS system. <br /> i <br /> A one-inch diameter PVC pipe will carry air from the blower to the sparging points. The PVC piping <br /> will be installed beneath the ground surface. A plan of the proposed piping system is depicted in <br /> Figure 6. <br /> 3 . 2 . 3 . PROPOSED MONITORING ACTIVITIES <br /> Quarterly ground water monitoring and sampling is proposed throughout the remediation period . <br /> However, we recommend monthly measurements of ground water depth and dissolved oxygen in <br /> monitoring wells h1W- 1 through MW-9 on a monthly basis to determine if ground water mounding <br /> is occurring as a result of the operation of the IAS system . <br /> 3 . 3 . PERMITTING <br />{{{ An application for a site specific permit will be submitted to the San Joaquin Valley Air Pollution <br />'I Control District (SJVAPCD) prior to initiation of the remediation project In addition, proper building <br /> 1 pemuts will be obtained from the City of Stockton Building Department for necessary construction <br /> work, including natural gas and electrical source installations. <br /> 3 . 4 . SYSTEM MAINTENANCE <br /> The SVE/IAS system will be maintained on a weekly basis, according to manufacturers <br /> recommendations. After stabilization, routine maintenance would represent the only periods of <br /> "down time ' for the unit. One to two times each month (assuming 24 -hour operation), the unit will <br /> be shut down for routine maintenance procedures such as lubrication, oil changing, and system <br /> adjustments. <br /> 3 . 5 . CONFIRMATION SOIL SAMPLING <br /> After approximately six months of operation or efficiency of the unit has declined, confirmation soil <br /> sampling should be performed withing the "core" impacted area. The confirmation soil borings will <br />