My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> E <br /> 03 July 1997 <br /> AGE-NC Project No . 95 -0121 <br /> Page 3 of 4 <br /> SOIL VAPOR EXTRA CTIONi1N--SITU AIR SPARGING <br /> • Based upon the above referenced volume of the core area and present ground water elevation <br /> at the site, we anticipate installation of five SVE wells and seven IAS points will be necessary <br /> for successful remediation. The approximate costs for installation of the SVE wells and IAS <br /> points will be $ 15,000 . <br /> • A thermal oxidizer-based SVE system and compressor-based IAS are recommended for the <br /> site. The approximate cost for design and installation of an SVE/IAS system will be $20 ,000 <br /> to 530 ,000 . <br /> • Based upon the an evaluation of site conditions, the estimated duration for operation of an <br /> SVE/IAS system at the site is 18 to 24 months; an 80 and 90 percent reduction of <br /> hydrocarbons should be feasible at the site. The estimated cost for operation, maintenance and <br /> monitoring (including unit rental) will be between 554,000 and $84 ,000 . <br /> • Periodic costs for operation of the SVE/IAS system, such as non-routine maintenance and <br /> supplemental fuel , is estimated between 515,000 and $30 ,000 . <br /> • Costs for laboratory analysis, permitting, regulatory liaison and report preparation is <br /> estimated between $ 10,000 and $25, 000 . <br /> The following is a summary of costs for installation and operation of an SVE/IAS system for <br /> remediation of the core area of hydrocarbon impaction at the Nomellini site: <br /> TASK COST <br /> Installation of SVE wells and IAS points $ 15 ,000 <br /> Design and installation of SVE/IAS system 1 - $ 20,000 to $30. 000 <br /> Monitoring andinaintenance $54,000 to $84,000 <br /> Non-routineniaintenance and supplemental fuel $ 1500 to $30.000 <br /> Regulatory liaison ; laboratory analysis, report preparation $ 10,000-$252000 <br /> TOTAL: S114,000 to 134,000 <br /> Based upon the estimated cost presented herein, excavation of the core area of hydrocarbon-impacted <br /> soil at the site does not appear to be cost-effective. Therefore, we recommend installation of an <br /> SVE/IAS system at the site. <br /> - - - - Advanced GuEnvicon ucatal, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.