My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Includes four 20 foot GeoProbecoriings near the sewer line, and near the gasoline tank <br /> 439- 1779-3. Report costs are included. $ <br /> COST: <br /> 3b, OPTIONAL Cost of one 24tich diameter, 40 foot boring construction near the <br /> gasoline tank #39- 1779-3 . This task includes continuous sampling where needed, 2 soil <br /> analyses for TPH-g and BTEX, construction of geologic logs, one water sampling <br /> (analyses for same). Price includes geologist/engincer, drilling equipment, supplies, soil <br /> drums (if appropriate) , decontamination, photoioiuzation detector- Price includes two <br /> TPH-g and BTEX analyses per boring. Report costs are included. $ 2 O <br /> COST: <br /> TPH-g/BTEX lab fees ( 10 day turn around) $ T— sample <br /> 3c. Cost for 2-inch diameter, 40 foot well construction, continuous sampling where <br /> needed, 2 soil analyses for TPH-g and BTEX, construction of geologic logs, one water <br /> sampling (analyses for same). The cost is appropriate for vapor well construction or <br /> monitoring well construction. <br /> Price includes geologist/engineer, drilling equipment, supplies, soil drums (if <br /> appropriate), decontamination, photoionization detector. Price includes two TPH-g and <br /> BTEX analyses per boring/well . Report costs are included. <br /> 77 <br /> COST: <br /> 3d. Cost for 4-inch diameter, 40 foot well construction, continuous sampling where <br /> needed. 2 soil analyses for TPH-g and BTEX, construction of geologic logs, one water <br /> sampling (analyses for same). <br /> Price includes geologist/engincer, drilling equipment, supplies, soil drums (if <br /> appropriate), decontamination, photoionizauon detector. Price includes two TP) i-g and <br /> BTEX analyses per boring/well, Report costs are included. 70 <br /> COST: <br /> TASK. 4 - AQUIFER AND SOIL VENT TESTING <br /> 4a. Complete vapor extraction system (VES) tests and soil parameter tests which will <br /> provide information for designing a corrective action. Q 1 <br /> f 'Type of test for unsaturated zone: VES Test pumping: one $—�-�- t�=f—�= <br /> Cost of test including interpretation of data <br /> 4b. Complete aquifer tests which will provide information for designing a corrective <br /> action. <br /> Type of aquifer test: pumping test $ V � 00 <br /> Cost of test including interpretation of data � <br /> i <br /> 2 <br /> I <br /> Le ' d 9S62S9V60ET Oi �10iN3WNONION3 NHI63idH WMdd eE : £T 266T-T£-onu <br />
The URL can be used to link to this page
Your browser does not support the video tag.