Laserfiche WebLink
4e. Report - includes projections of duration required for aquifer and unsaturated zone <br /> restoration, possible degree of cleanlines likely to be achieved and equip dedation <br /> from water quality. Cost of report: (� <br /> TASK c - SITE ASSESSMENT REPORT <br /> 5. Site Assessment Report (also called the Problem Assessment Report) submittal and <br /> regulatory approval. Optional treatment for soils and groundwater include in-situ bio- <br /> treatment with vapor extraction, pump and treat and others. <br /> Cost of draft report, modifications and final report: <br /> TASK 6 - REMEDIAL ACTION WORKPLAN <br /> 6. Remedial Action Workplan writing, modifications and regulatory $appr� S <br /> Cost: <br /> TASK 7 - REGULATORY LIASON SERVICES / PERMITTING <br /> 7a. Cost for attending meetings with regulators, agel}c + bason or performing work not <br /> described above: Cost: <br /> Estimated number of hours: <br /> Total <br /> 7b. Develop draft workplans, revisrons and final copies of workplans for habove <br /> mentioned work (for one time workpIan submission) $ ^ <br /> Cost: <br /> 7c. Cost of permits and permitting time will be based on a time and materials basis. <br /> Costs of permitting and permits may change between present time and time that this task <br /> is implemented. <br /> _Jhr. <br /> Estimated hours for Tasks 7a and 7b: <br /> 3 0 his_ <br /> 7d. Cost of permits : Estimated cost: <br /> TOTAL . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . $ -- <br /> OTHER COSTS: <br /> Soil and water disposal of RCRA and nonRCRA wastes will be based on a tune and <br /> materials basis depending on the laboratory analyses and the entry requirements for <br /> landfills or facilities at the time of disposal. <br /> 3 <br /> 22 ' d 9S62S9V60ZT 01 "10IN3WNWION3 NHIS3i�]H WOJd 6z : 2T 2667-T2-onH <br />