My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AW <br /> d <br /> 03 August 1999 <br /> AGE-NC Project No. 95-0121 <br /> Page 5 of 6 <br /> • Approximately 5 to 15 feet east of EW- 1 ; <br /> • Approximately 5 to 15 feet east-northeast of EW- l ; <br /> • Approximately 5 to 15 feet north-northeast of EW- 1 ; <br /> • Approximately 5 to 15 feet north-northwest of EW4 ; <br /> • Approximately 5 to 15 feet west-northwest of EW- 1; <br /> • Approximately 5 to 15 feet west of EW- 1 ; <br /> • Approximately 5 to 15 feet west-southwest of EW- 1 ; <br /> • Approximately 5 to 15 feet south of EW- l ; and <br /> • Approximately 5 15 feet southeast of EW- 1 . <br /> Initially, each probe boring will be advanced to 40 feet bsg. However, total depths of probe borings <br /> will be based on field observations and field screening using an organic vapor monitor (OVM). Field <br /> procedures for advancement of borings and collection of soil samples are presented in Section 4.3 . <br /> 3 .4. PREPARATION OF FEASIBILITY/REMEDIAL INVESTIGATION REPORT <br /> Upon completion of all three pilot studies, a feasibility/remedial investigation report will be prepared <br /> presenting the findings of each pilot study. The report will discuss feasibility and cost effectiveness <br /> of remedial alternatives. Conclusions and applicable recommendations will be included in the report. <br /> The report will be in a format acceptable to the PHS-EHD and the RWQCB, and will be reviewed <br /> and signed by a California Registered Geologist. <br /> 4.0. PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist. Procedures for a ground water draw-down pump test, for collection of soil <br /> samples for microbial enumeration and physicochemical analysis and for an ORC pilot study are <br /> outlined below. <br /> 4. 1 . SOIL SAMPLE COLLECTION <br /> Soil probe borings will be advanced using direct push technology (Geoprobe 5400 soil probing unit). <br /> Relatively undisturbed soil samples will be collected at five foot intervals beginning at 15 feet bsg <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.