Laserfiche WebLink
Nomellial Construction Co, c <br /> 1045 West Charter Way, Stockton, CA z <br /> f Summary and Comparison of Responses to the Invitation <br /> for Bid Form Issued on May &, 1998 - <br /> Harding Advanced international m <br /> Lawson GeoEnvironnno Technology Artesian <br /> Associates -ntai, lnc, CorP. Environmental - - <br /> Task f - Pterm Ing RL Per mfttl ng <br /> 1 . Review olexisting repartslFnformatton: $790.00 nla 80, 00 $O00 <br /> 2 . Work plan preparation[SHSP preparation: $10200.00 $250.00 $600, 00 $0.00 <br /> 3. Drilling permit $1 ,260.00 $100. 00 -5195.00 $500.00 <br /> 4. Regulatory liaisow $1 ,264 .00 $280. 00 $325 .00 $340.00 oz <br /> 7otar _Task 1 : $4,514.00 3630.00 313120.00 $840.00 - -r <br /> Task 2 - Drilling, Sampling & Installation of Weirs z <br /> 1 . Installation and sampling of SVE wells: $3,775. 00 $3,645.00 $4 ,250.00 520600,00 <br /> 2. Installation of IAS wells: $6 ,174. 00 541550.00 $31920.00 $4190(00 x' <br /> 3. LabWatory anatysls - TPH-g/di6TE&X: $21400,00 $2,070. 00 $1 ,540 ,00 $190060 c=am <br /> 4. Laboratory 2narysls - VOCs 8280: 1 $ 12980,00 $1 , 725.00 $1 ,320.oC $ 1 ,800.00 <br /> S. Soil aeration (a) Permhng and sampling: $2,500.00 $300.00 $415.00 $500. 00 <br /> (b) Sam ping - TPH-g1eTE&X2: $120. 00 $100.DO $77.00 $90, 00 a <br /> Total - Task 2: 5161949400 $ 120390.00 3111522.00 $11 ,690400 <br /> Task 3 - System installation <br /> 1. Installation of SVEIIAS network: $151635.00 $3,425.00 $5,100.00 $341500.00 <br /> 2. Fenced enclosure: $1,100.00 $11375.00 $250.00 $4 , 500,00 <br /> 3, installation of natural gas line (300 it $900.00 $31165 .00 $730.00 3415DO.00 <br /> 4. Installalm of electrical connection: - $11200.00 3650 ,00 $750. 00 $B4OOD,00 <br /> S. Installation of SVEIfAS systems (rnove4n, etc.)l: $14,138.00 $ 550 .00 $750, 00 $4.000.00 <br /> Total - Task 3 : $33,973.00 $ 9065900 ST,$00.00 $53,500.00 <br /> Task 4 - Monthly Maintenance and Monitoring <br /> 1. SVEIIAS Rental Fees: 599,360.00 $52MOIDD 5400660. 00 $80,OOD.00 <br /> 2. Maintenance: $10,800.00 $4,800.00 $2,400. 00 $20400 ,00 <br /> 3. SVE start-up moritorng (two weeks): $13,800,00 $900400 $1 ,600. 60 $2,100.00 z <br /> 6 <br /> 4, SVE monitoring (standard); 5911680.00 $6,480000 $161000.OD $71200,00 <br /> S. Soil vapor samples - TPH-g18TE&X: $7,20D,00 $2,496.00 $5, 390.40 $2, 160.00 <br /> 6 . LAS start-up monitwing (one month) : $1 ,606,00 $675, 00 $2,400.00 $1 , 500, 00 -� <br /> 7, IAS moniloeng (standard): $8,555.00 $3,105 .00 $17,250.00 $93209.OD <br /> Total - Task 4: $230,995400 $71 ,256,00 387,636.46 $841560,00 b <br /> O61C8198988IDCOM,WK4 Page 1 of 2 <br />