Laserfiche WebLink
Harding Advanced International <br /> Lawson GeoEnvironme Technology Artesian c <br /> z <br /> Associates mntal, Inc. Corp. Environmental <br /> Task 5 - Bt-annual Soil Sampling <br /> 1 . Advancement of two sail borings to 25 feet; a total <br /> of four sampling events Will occur; Iota€ footage will be �o <br /> 200 feet (must include all rrobfdemob, sampling @m e, <br /> backfilling, sup piles, etc.): $3,400.00 $21000.00 $6r250, DD $21000.00 - <br /> 2. Laboratory analysis - TPH-gfdtBTE&X: $2546.00 321484. 00 $ 1 ,848. 00 52116D.00 <br /> 3 . Laboratoiy anatysis - VOCs 8260 : $1 ,206.40 $11150-DO $860. 00 $1104D.00 � <br /> Total - Task 5 : $71240.00 553634,00 $8,97e. 00 55200.00 <br /> Tack 6 - Quarterly Ground Water Monitoring o <br /> 1 . Ground water monrtodng: $ 101166.00 $7,920.00 $81260.00 $712D0.00 <br /> 2. Labc calory analysis: $83640.00 $7,452. 00 $5,544,00 $6,840.00 — r, <br /> 3. Laboratory analysis: $1120D,DD $10,35400 $7,920,00 51o,80o.D0 z <br /> 4. Disposal of purgedfaxtracted water- $2 ,230,00 $500. 00 $2,270.00 $10000.00 <br /> Total - Task 6: $22,236,00 526,222,00 $24,014.00 $25,640,00 <br /> r <br /> Task T - Reporting r' <br /> 1 . Preparation of quanedy reports (comprehensive): $30,800. 00 $8140D.00 $71200 .00 $12,o00,e0 _ <br /> Total - Task 7: $30,600,00 $6,400,06a <br /> $7,200.00 $ 12,000 .00 <br /> Additional Activities Required to Complete Scope <br /> i.e., design etc, $9,000.00 $0.00 $0.0D $0,00 <br /> JQMI = Tasks 14 (plus any Additional <br /> Activitiesl: $355,707.00 $131A97AD 51481070.40 $193,630,00 <br /> Estimates of Overall Fuel Consumption Costs Fuer Fuel = Fuel = Fuel = ? ' <br /> based upon a 24-month treatment period: $1 ,000.00 per 314,400 .00 to $36,525.00 for <br /> month, $24,000 .00 for first yr. ; <br /> $24, 000 .00 for 2 yrs. Amount for 2 0 <br /> 2 yrs- yrs.? <br /> Flecuialy = 7 Electricity = Electricity = 7 Electricity = ? <br /> $61000.00 to <br /> $9,600 for 2 <br /> Yrs- `d <br /> 06/08198 98BIDCOM.WK4 Page 2 of 2 <br />