JUN. 9. 1996 4 : 15PN1 NOMELLINI GRILLI MCD N. 9927 P. 5 <br /> M <br /> TASK 5 • Bi•ANNUAL SOM SAMPLING <br /> 1 . Advancement of soil borings to 25 feet; a total of <br /> four sampling events will occur, total footage will be <br /> 200 feet (must include all mobldemob , sampling <br /> time, backfilling, supplies, etc.j: 200 fact @ $ 17/fool S <br /> t ■ 2. Laboratory analysis - TPH-g/d/11TEX: 24 @ S110/each S 2,640 <br /> 3. Laboratory analysis - vtaCs 8260: a @ $ 150/each S 1 ,200 <br /> : ■ TOTAL - TASK 5: $ 71240 <br /> TASK a - QUARTERLY GROUNDWATER MONITORING <br /> " 1. Groundwater monitoring <br /> 9 wells @141 .20/weB=$1 ,270,00/por quarter, 6 qtrs. @ Si, 270.80/qtr, _ $ _ 100766 <br /> 2. Laboratory analysis - TPI -g/d/STEX: 72 @ $120/each $ 8,640 <br /> . w 3. Laboratory analysis - VOCs 5260, _ 8 @ Wo/aach $ 1200, <br /> 4. Disposal of purged/extracted water: 1 ,000 gallons @ $ 2.23/gal. S 2.230 <br /> � + TOTAL • TASK e: $ 22,250 <br /> TASK 7 = REPORTING <br /> ` • 1. Preparation of quarterly reports (comprehensive): 8 @ $3,850/each $ 30 ,800 <br /> TOTAL • TASK 7: $ 30,800 <br /> Additional Activities Required To Complete Scope IDasign): $ 9,[100 <br /> GRAND TOTAL: $ 355,707 <br /> u <br /> Note: Design activities required include preparation of trench, concrete, and electrical details for <br /> building permits and construction, and detail for AQMD. <br /> Supplemental Fuel costs are estimated to be 51 ,000 per month. The total costs for a 24 month <br /> operation period are $24,000. <br /> to Assumptions used to estimate casts are attached (Attachment 1). <br /> • Approved By: <br /> HARDING LAWSON ASSOCIATES <br /> • Gregory G E sr o, R.G., <br /> Managing Lip Geologist <br /> to <br /> G:it'4P1®tiCa41a9a5.t to Harding Lawsoa Asaoetatas E&2 <br /> , ■ / r f ' l <br />