Laserfiche WebLink
JUN, P. 1998 4 : 15PM NOMELLINI GRILLI MGD N0. 9927 Pt 5 <br /> ATTACHMENT <br /> LIST OF ASSU NPT1ONS USED TO COST EFFORT <br /> Assumptiono <br /> Assumptions for TmA 1 <br /> i <br /> Assumes review of ten reports. <br /> Work plan is roquirad only to obtain boring permits. <br />] Includes only San joaquin County drilling permit fees for a period of 2 years and AQMD permit <br /> Assumes two meetings per year at four hours each. <br /> Assumptions for Task 2 <br /> Assumes site conditions and boring and boring and well specifications remain consistent with <br /> RFP. <br /> • � Assumptions for Task 3.1 Installation of SWE IAS network <br /> Trenching <br /> + Tranches are 2 ft by 2 IL <br /> .. • 400 liner feet of trench. <br /> • No utility crossing or relocatiou. <br /> t <br /> • Asphalt patch is 4 inch thick no seals no marking replacement .5 inch ag Cal Trans mod type Ii. <br /> Its Concrete pod <br /> • No excavation. <br /> + Sub soil suitabla for load and compaction, <br /> • Easy access for concrete truck . no pump truck- <br /> Assumptions Lor Task 4.1 <br /> • Thermal oxidizer capable of treating up to 25o din. <br /> s Blower is a Sutoybilt, positive displacement blower Model 4M or <br /> . � P �p approved equivalent. <br /> Startup monitoring consists of daily visits to the site by a technician (overnight stay for the first <br /> three days). <br /> During the first two day, startup assist will be provide by the supplier of the thermal-ox <br /> equipment <br /> • One day trip for a project engineer during startup, <br /> Assuraptionsfor Task 4.2 <br /> _ Material and equipment cost for routine maintenance of equipment such as lubrication of blower, <br /> greasing of boarings, filter changes, etc,. <br /> Labor for this act]vities is included in task 4. 3. <br /> .w <br /> G:IVJPfCatf94taepS.tta Harding Lawson Asseelalas EW3 <br />