My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN, 9. 1998 4 : t6PM NOMRLLINI GRILLt MCD IR 9927 P, 8 <br /> M7 <br /> INVITATION FORBID o7rilI,r, /%Oft fat <br /> BID FORM tic <br /> Nomellini Construction Co. <br /> 1045 West Charter Way, Stockton, Catifornia <br /> TASK I - PLANNING AND PERMITTING <br /> 1 . Review of existing reports/information: hrs, <br /> 2, Work plan preparation I SHSP preparation: Lump sum : Ste _ <br /> 3 , Drilling permit: $ 260roo <br /> 4 . Regulatory liaison: :INS. @ $ <br /> TOTAL - TASK1 : S <br /> TASK 2 - DRILLING , SAMPLING AND INSTALLATION OF WELLS <br /> 1 . Installation and sampling of SVE wells: 5 wells (st} lwell $ <br /> 2, Installation of IAS wells: 7 wells @ /well $ <br /> 3 , Laboratory analysis - TPH-g/d7BTE&X: 20 @ &�':a7eaeh $ 02470 ' <br /> 4. Laboratory analysis - VOCs 8260: 12 ( (�.37ffeach $ Lice ' <br /> i 5 , Soil aeration (a) Permitting and sampling: Lump sum : S-34v 49 <br /> (b) Sampling - TPH g/BTE&X 2 @ /each S <br /> TOTAL - TASK 2 : S 1 "< 5t. <br /> TASK 3 - SYSTEM INSTALLATION <br /> 1 _ Installation of SVUAAS network: Lump sum: $ <br /> 2. Fenced enclosure: Lump sum: $ / ;5 <br /> 3 . Installation of natural gas line (300 fee): Lump stun: $ 3f <br /> 4a installation of electrical connection: Lump sum: S 4th <br /> 5, Installation of SVE/IAS systems (move-in, etc.): Lump sum= $� <br /> TOTAL - TASK 3: $L <br /> I <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.