Laserfiche WebLink
JUN. 9. 1998 4 : I5PM N014FILLINI GRILL [ MCD NQ, 9927 P, 7 <br /> �f Attachment t w List Of Assumptions USW To Coat Eflart <br /> Assumptions for Task 4.3 <br /> Startup monitoring consists of daily visits (8 hrs.y a day including mop time) to the site by a <br /> • technician (overnight stay for the first three days). <br /> • During the first two day, startup assist will be provide by the supplier of the thermal-ox <br /> equipment <br /> • One day trip for a project engineer during startup. <br /> Assumptions for Task 4.4 <br /> • Four visits a month (a brs.. a day including mob time) by it technician to the site to collect O&M <br /> data. <br /> • 8-hrs., for a Project Engineer for project management a month. <br /> Assumptions for Task 4.5 <br /> + Samples collected using t liter Summa canisters and analyzed using EPA method TO-3 for TPH-d, <br /> -g and BTEX. <br /> 3 Assumptions for Task 4.6 and 4.7 <br /> i3 . Assumes startup of 1AS begins during startup of SVE system and will only require additional 4 <br /> hours per week to collect monitoring well data (no additional mob time has been included). <br /> • Weekly (startup) and monthly (standard) IAS monitoring will be conducted during SVE <br /> monitoring visits. Only additional field time required per month to collect monitoring well data <br /> has been included in the proposal (no additional mob time has been included). <br /> Assumptions for Task 5 <br /> • Assumes site conditions and boring and boring and well specifications remain consistent with <br /> RFP. <br /> Assumptions for Task 6 <br /> ,� • Access to monitoring wells is not limited. <br /> • Site conditions and number of wells and specifications aro consistent with RFP. <br /> ;� G:\wHC9iC134739a5.116 Harding Lawson AsacwMes FA <br /> 44 Y y' / <br />