Laserfiche WebLink
JUN. 9. 1998 4 : 16PM NO,ORLLINI GRILL [ MCD NO, 9927 � F, 10 <br /> Cd I` W G <br /> INVITATION FOR BID <br /> BID FORM <br /> Nomellini Constructiot, Co. <br /> 1045 West Chatter Way, Stockton, California <br /> I <br /> TASK I - PLANNING AND PERMITTING <br /> I . Review of existing reports/heorraWon: 8 hrs. @ $O/hr. <br /> 2. Workplan preparation / SHSP preparation: Lump sum: $600.00 <br /> 3 . Drilling permits: Lump sum: $ 195.00 <br /> 4. Regulatory liaison: 5 hrs. @ $65/hr. $325. 00 <br /> TOTAL - TASK 1 : $19120.00 <br /> TASK. 2 - DRILLING, SAMPLING AND INSTALLATION OF WELLS <br /> 1 . Installation and sampling of SVE wells: 5 wells Q $ 850/well $4�MmOO <br /> 2. Installation of IAS wells: 7 wells @ $5601well $3 ,920.00 <br /> 3 . Laboratoryanalysis - TPH-gldBTE&Kt;: 20 @ $77/ca. $ 1 ,540.00 <br /> 4. Laboratory analysis - VOCs 8260 12 @ $ 110/ea. $ 13320-00 <br /> 5. Soil aeration (a) Permitting and sampling : Lump sum: $415.00 <br /> (H) Sampling - TPH-g/$TE&KC 2 @ $38 .50/ea. $77.00 <br /> TOTAL - TASK 2 : $11,522.00 <br /> TASK 3 - SYSTEM INSTALLATION <br /> 1 . Installation of SVEdAS network° Lump sum: $5, 100,00 <br /> 2. Fenced enclosure: Lump sum- MOM <br /> 3 . Installation of natural gas line (300 feet): Lump sum: $750.00 <br /> 4. Installation of electrical connection: Lump stun: $750.00 <br /> 5. Installation of SVE/IAS systems (move-in, etc.): Lump sum• $750.00 <br /> TOTAL - TASK 3 : $7,600.00 <br /> Page 2 - l <br />