My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 2:26:31 PM
Creation date
3/6/2019 1:34:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN, 9. 1998 4 : 17PM NOMULINI GRILL [ MCG N0, 9927 P, 11 <br /> I <br /> TASK 4 — MONTHLY MAINTENANCE AND MONITORING <br /> 1. SVE/IAS rental fees: 24 months @ $ 1,695/mo. $40,680.00 <br /> 2. Maintenance: 24 months @ $ 100/m9. $2,400 .00 <br /> 3 . SVE start-up monitoring (two weeks): Lump sum: $ 1 ,600. 00 <br /> 4. SVE monitoring (standard) 24 months @ $750/mo. $ 18,000.00 <br /> S . Soil vapor samples - TPfig/BTFAX: 48@ $ 110. 50/ea $57306.40 <br /> 6. IAS start-up monitoring (one month),. Lump sum: $2,400.00 <br /> 7- IAS monitoring (standard): 23 monrhs @ $750/mo. $ 17,250.00 <br /> TOTAL - TASK 4 : 587,636.40 <br /> TASK 5 — BI-ANNUAL SOIL SAMPLING <br /> 1 . Advancement of two soil borings to 25 feet; a total of four sampling events will <br /> occur; total footage will be 200 feet (must include all mob/demob, sampling time, <br /> backfilling, supplies, etc.): 200 feet @ $31 .29foot $6,250.00 <br /> 2. Laboratory analysis - TPligld/BTE&X: 24 @ $77/ea. $ 1 ,848.00 <br /> 3. Laboratory analysis - VOCs 8260: S @ $ 110/ea. $880,00 <br /> TOTAL — TASK 5: $8,978.00 <br /> TASK 6 — QUARTERLY GROUNDWATER MONITORING <br /> I . Groundwater monitoring - <br /> 9 wells @,a $ 115/well = $1 ,035/quarter; 8 gtrs . @ $ 1 ,035/qtr. $8, 290,00 <br /> 2. Laboratory analysis - TPH&(d/8'M&X, 72 @ $77/ea. $5,544.00 <br /> 3 . Laboratory analysis - VOCs 8260: 72 @ $ 110/ea. 57,920.00 <br /> 4. Disposal of purged/moracted water. 1 ,000 gallons @ $2.27/gal. $2,270. 00 <br /> TOTAL - TASK 6e $24,014.00 <br /> TASK 7 — REPORTING <br /> 1 - Preparation of quarterly reports (comprehensive): 8 @ 900/ea. 57,200.00 <br /> TOTAL - TASK 7: 579200.00 <br /> TOTAL - TASKS 1 - 7: $148,070.40 <br /> Page 2 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.