My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wgi <br /> E . <br /> 11 KLEIFEFE1.t)ER <br /> 3.2 QUALITATIVE FIELD SCPEENING <br /> A Photovac TIP using a photoionization detector (PID) will be used to screen each soil <br /> sample collected from the borings. The PID field screening of the soil samples should <br /> provide a qualitative indication of the presence of petroleum hydrocarbons. The PID <br /> meesures total ionizable compounds in air in parts per million by volume (pTmv) in <br /> relation to a select calibration standard. <br /> For the protection of the field crew. the PID will also be used to measure the total v_,latile <br /> concentrations in the breathing zone prior to and during the drilling of the soil borings. <br /> 3.3 MONITORING WELL CONSTRUCTION <br /> W The wells will be installed in soil borings advanced with a truck mounted drill rig equipped <br /> with 8-inch hollow kzrr- augers. The welis «-ill be 10 to 20 feet bellow first encountered <br /> ground water. Based on the results of the soil assessment, ground water is anticipated at <br /> approximately 25 feet below the ground surface: however due to drought conditions ground <br /> water may be encoumered at deeper levels. <br /> The proposed construction details for the ground water monitoring wells are as follows: <br /> o The wells will be constructed in 8-inch boreholes. <br /> o The well casing will be 2-inch inside diameter, flush-threaded joint,schedule <br /> 40 PVC pipe. <br /> o The screened section may be set I to 5 feet above and 10 to 20 feet below the <br /> depth where ground water is first encountered unless: <br /> 1. Semi-confined or confined aquifer conditions are encountered. <br /> 2. High petroleum hydrocarbon concentrations are indicated in the <br /> ground water. <br /> 3. An aquitard is encountered. <br /> F13-90-66 5 �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.