My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0012566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:30:47 PM
Creation date
3/6/2019 1:56:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012566
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ea.c . - �,:.:�� w-v""`: •.. _'` ,.. .� ".` '�'�` R'x .x, r�r� Y,d'a� � �.-fi'� kcr ravk+, <br /> - a n <br /> KLIINF:LDER <br /> If any of the above conditions are present, the screen section depth and <br /> length may be revised. <br /> o The PVC pipe will be steam-cleaned prior to installation. <br /> o Well screen sections will be perforated with 0.010 or 0.020-inch factory-cut <br /> slots. The decision will be trade out in the field based on geological <br /> conditions. <br /> o The annular space between the pipe and the wall of the boring will be <br /> backfilled with the appropriate clean Lone Star Industries Monterey sand to <br /> approximately I to 2 feet above the top of the perforated section. <br /> o A 3-foot bentonite plug will be placed above the sand pack to provide a seal <br /> against surface water infiltration. <br /> o The remaining annul<r space will be filled with cement/bentonite grout to <br /> the surface. <br /> o Each well will be secured inside a locking well cover. <br /> 3.4 MONITORING WELL DEVELOPMENT.-%-D SAMPLING <br /> The three monitoring wells will be developed approximate 24 hours after instal!:?ia:.•to <br /> allow the grout to set. Each well will first sampled with a clear acrylic bailer to visually <br /> inspect the sample far a product layer or sheen. If no product layer or sheen is observed on <br /> the water samples, the wells will be developed with a surge-block, air-lift tool, and/or <br /> — bailer. Surging along the screened interval of the well will draw the sediment from the <br /> formation into and out of the well and set the sand track. The sediment-laden water will be <br /> air-lifted from the well at a rate of approximately 0.50 gallons per minute(gpm). Each well <br /> will be developed until the discharge water runs relatively clear of fines. Approximately 5 <br /> to 10 well volumes will be removed from each monitoring well. <br /> After the wells have been developed, the aquifer will be allowed to equilibrate. The wells <br /> will then be purged and sampled. During purging, field parameters (pH, conductivity, <br /> temperature) will be monitored. Samples will be collected after the field parameters have <br /> stabilized (normally requiring the removal of 3 to 5 well volumes). After collecting a <br /> sample, the sample bottles will be immediately sealed. labeled, and placed in an iced <br /> F13-90-66 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.