Laserfiche WebLink
,� §� _ �-�.--�_����� ��€ � -��� -��--�.i.�'�, ��. ��w*.; - K���kY � •� '�� ;� :�� iso ,� '. ; <br /> ;� �+_ ;.w .�' m��" �qt+"�*j;�°N',3.. �"fi.""i...,� -�.'w`„.,"� „�`' .dip�� ''.� '� _ -• <br />�, ��,;�;.y!i 4++ F�.�� .:y�r�"„iY:-+ 'dpi �^���:.���n..i .c '� � "�-'H . y:a� ..3t�.� •.'r -+5d.�'"- ? r K 'u�i^ .5 �°'�' <br /> Lr <br /> s .v <br /> 3 <br /> 1 <br /> WORKPLAN' <br /> This phase of work includes the following: <br /> • PrcpTu tion of a workplan and a safety plan for submittal to the San Joaquin County <br /> Water District <br /> • The drilling of three soil borings to a depth of about 45 feet below ground surface for <br /> soil samples and analyses; <br /> o The completion of three borings as two-inch groundwater monitor wells; <br /> • The purging of the wells and the sampling of the groundwater for analyses; <br /> •Surveying of the top of the casing elevation and incorporation of it with the existing <br /> well data and the production of a potentiometric surface map based on the <br /> elevation of the groundwater above mean sea level. <br /> The purpose of this phase of work is to evaluate the presence and possible lateral and <br /> vertical extent of fuel hydrocarbons that may be present in the soil subsurface and to <br /> assess the groundwater quality beneath the site. At Ieast two wells are proposed to be <br /> drilled in the downgradient direction,and one well in the upgradient direction. All of the <br /> new wells will lie outside of the area already containing wells. <br /> As requested in your letter dated February 10, 1992 to Mr. Dante John Nomeilini,the <br /> rert is to show: <br /> Status of investigation and cleanup activities including the results of a investigations <br /> completed to date; <br /> • .Proposed continuing or next phase of investigation; <br /> • Method of cleanup proposed or implernented,schedules for the completion of <br /> die <br /> investigation of the site and remediation(to occur in the next phase of work); <br /> • Method and location of disposal of the released hazardous substance and any <br /> contaminated soil,groundwater or surface water, <br /> • Manifest required for transport of hazardous substances; <br /> • Monitoring well data including groundwater elevation,pH,conductivity,gradient; <br /> • Analytical results of groundwater or soil sapling;and <br /> • Site map showing the"zero line"of contamination,if known,and changes in the above <br /> measurements over the last quarter. <br /> SITE FLAN <br /> Site plan maps will be used to locate the monitor wells that are proposed to be installed <br /> (Figure 2), Each boring,B-13 and B-15 will be converted into a monitor wells,MW-1 <br /> through MW-3,respectively. <br />