Laserfiche WebLink
�$.,;'- =,'�='�- �� _�. ��..�.� � =�� � ,, � � - �� =may.`. ,� mo=w -• —��x; <br /> °' s.,• m�`<# .^a #.� a,- . .mow ,,. - �, �q�Z ,rc� «mow <br /> MM <br /> w <br /> kNNJ KLEINFELDER <br /> �—, stockpiled soil will be assessed from PID field readings, confirmation samples from <br /> the excavation,and possible samples from the soil piles. <br /> Disposition alternatives for the excavated soil can be evaluated once the analytical <br /> results have been received from the confirmation samples. Disposition alternatives <br /> would include: <br /> o Onsite treatment or aeration according to San Joaquin Air Pollution Control <br /> Department(Al,CD)guidelines. <br /> o Offsite aeration and CIass II or Class III landfill disposal according to APCD <br /> and Regional Board guidelines. <br /> o Class I or Class II disposal. <br /> 7. Nomellini Construction intends to expedite the additional excavation and plans to <br /> coordinate the field and analytical activities with the SJLHD. An estimated project <br /> schedule is included as Plate 4. <br /> APPROVED <br /> Approval of thein n!ar.;cxtcnds r.n!y to that which Is shown <br /> ana d�.criho ktc-ca.:, tut clot: n-t avlhnrtav or approve <br /> clay or,rd-�n d'wla,ian of rlquimmonls of :Tate 10W1 O1 - <br /> local O:u;rcacoe. <br /> One Hot n=v7n.oved ,..ons s!a1l be an the preled <br /> silo nl all !:=!s. <br /> sav1N" E..NTAL <br /> fAL7Ha!vlslotOF C1: IrAC5TCCKTON, A ORS <br /> w... _... a� <br /> z <br /> 140-88-1809 <br />