Laserfiche WebLink
r Page 3 <br /> i <br /> 1 sample collected 10 feet away from the excavation at a depth of 16 feet Based on the positive <br /> organic vapor screening results, Nomellini Construction decided to backfill the excavation with <br /> clean fill and further assess the extent of the contamination with a soil boring program <br /> In May, 1989 Kleinfelder supervised Y p ed the drilling of nine Boll borings (B-1 through B-9) in the <br />' vicinity of the former tank pit. Samples were analyzed from depths of 10 5 to 26 feet Ten of 15 <br /> soil samples contained total petroleum hydrocarbons as gasoline at levels ranging from nondetect <br /> to 450 ppm <br /> High concentrations of TPH as gasoline (TPH-g}, benzene toluene,uene, ethylbenzene, and xylenes <br /> (BTEX) were detected just above and below the groundwater surface in boring B-1 which was <br /> located adjacent to the south edge of the excavation Similarly, high TPH-g concentrations were <br /> detected just above the groundwater surface in B-2, approximately 20 feet north of the former tank <br /> excavation The remaining samples had relatively low concentrations detected, but TPH-g levels <br /> were consistently detected just above the groundwater surface Groundwater was encountered at a <br /> depth of about 25 feet below ground surface <br /> In February, 1991, Kleinfelder drilled three bonngs B-10 through B-12 These borings were <br /> subsequently converted into monitor wells MW-1 through MW-3 TPH-g was detected in the <br /> E groundwater in February, 1991 in MW-1 through MW-3 at concentrations of 1,700 ppm, 10,000 <br /> ppm and 1,500 ppm, respectively In June, 1991, 15 feet of free product was measured in MW- <br /> 1 The groundwater gradient has generally varied between the northeast to southeast <br /> On March 16, 1992, Artesian Environmental Consultants measured hydrocarbon thickness in <br /> MW-1 to be 182 feet Groundwater flow direction on March 16, 1992 was to the southeast <br /> Water depth was measured on March 16, 1992 for MW-1 through MW-3 at 32 5, 32 7 and 32 4 <br />' feet below ground surface, respectively <br /> 1 <br /> I <br /> 100 Shoreline Hwy, Suite 295 B - Mill Valley, CA 94941 • (415)381-6456 FAX (415) 389-0423 <br />