My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
2900 - Site Mitigation Program
>
PR0009298
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 5:55:14 PM
Creation date
3/6/2019 3:13:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009298
PE
2960
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
01
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
plumes have impacted the groundwater beneath MW-1, MW-3, MW-4, MW-5, MW-8, & <br /> MW-9. MW-2, MW-6, & MW-7 appear to be outside the areas of contamination. <br /> TPH as diesel has only been detected in MW-4; that well is located close to the site of the <br /> removed diesel UST's which revealed minor amounts of soil contamintion. That well is <br /> within the plume originating at the Nomellini site to the east, and any attempt at cleanup is <br /> not feasible at this time. <br /> We have discontinued sampling MW-5, which is the responsibility of the property owners <br /> at 1045 W. Charter Way. We will continue to sample MW-9 until further notice, but have <br /> advised our clients that those costs should be paid by the owners of that site, since a major <br /> source of contamination is located there. <br /> RECOMMENDATIONS: <br /> We do not believe that quarterly sampling at this site is necessary until such time as the <br /> owners of the properties to the east and west implement site assessment and remediation <br /> work. Mr. Miles has been most diligent in performing required site assessment and cleanup <br /> work. Until work begins on the two off-site locations, semi-annual monitoring should <br /> . provide sufficient information to assist your office in reviewing the status of the area. <br /> We would appreciate your written approval of semi-annual monitoring so that we can make <br /> theya�p opriat changes in our sampling schedule. <br /> W . J' u ter & Associates <br /> cc izabeth Thayer, RWQCB <br /> . W. Miles <br /> R. Lautze <br /> J. Welch \S�EREDGfo� <br /> Independent Trucking <br /> Geo Properties <br /> W'iLLNM J.HUNTER <br /> L. Bradfish 11147 <br /> * <br /> NO.860 <br /> OF CPU <br /> • <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.