Laserfiche WebLink
Wm. J. Hunter & Associates 2220 Loma Vista Dr. <br /> Registered Geologists HEALTH Sacramento, CA 95825 <br /> Petroleum & Mineral Appraisers CE (916) 972-7941 <br /> FAX (916) 972-1683 <br /> November 14, 1995 <br /> Wendy L. Cohen, Senior Engineer <br /> CRWQCB <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Ref : 1145 W. Charter Way, Stockton <br /> Dear Ms . Cohen; <br /> We have received a copy of your November 8 correspondence to John <br /> Welch concerning our October 11 workplan, and wish to apologize <br /> for it ' s brevity and lack of detail . Instead of requesting an <br /> extension, we attempted to comply with your departments ' filing <br /> deadline even though we did not have sufficient time in which to <br /> do the proper background investigations that were required. <br /> During this time period, we were facing several other deadlines <br /> for workplans & reports that also needed to be completed. Rather <br /> than submitting an incomplete workplan, we should have requested <br /> an extension; thank you very much for giving us more time . <br /> We have contacted a geophysical firm to discuss the feasibility <br /> of a surface magnetometer survey, and will have specifics to <br /> include in the revised workplan. We are also researching firms <br /> and agencies to obtain aerial photographic coverage of the area; <br /> that information will be most helpful in identifying possible <br /> offsite sources, if they exist . <br /> We will attempt to submit a workplan which will cover all <br /> possible circumstances & options; however, it is hoped that your <br /> office will allow a certain degree of flexibility if we encounter <br /> unanticipated conditions in the field which require revisions or <br /> changes in the workplan during the work. <br /> The workplan will not include any investigative work offsite; <br /> if such work is determined necessary after completion of this <br /> phase, it will be necessary to obtain easements, rights of ways, <br /> and needed permits before additional work can be done . <br /> We have received permission to include the well recently placed <br /> on the east side of the property by Nomellini Construction Co. in <br /> our quarterly monitoring program, which is being handled by <br /> Del-Tech Geotechnical Support Services under our direction. A <br /> report covering the results of the latest work will be prepared <br /> and submitted to your office by 12/31/1995 . <br /> 1 <br />