Laserfiche WebLink
01/29/2004 16:53 20952 GEOLOGICAL TEq&S PAGE 05 <br /> Geoprobe®Groundwater N ,Wring Page 1 of 2 <br /> a a • be a <br /> ;K HOME ar <br /> ',tf)prn e^ Tcot�k <br /> I Sampling: kit-Groundwater-Soil Gas_Manuel I.QW,M,gnitp.,jng I Hydraulic Conductivity Geotechnical I Dirac[Sensing <br /> 0 Goo Rodwater Monitodfig Weis <br /> Advo nta,jes <br /> There's lot of excitement in the Environmental Industry about Geoprobe®Prepacked <br /> Screen Sizes Well Scr ens designed for setting Small Diameter Monitoring Wells. Prepacked screens <br /> Installation consist a standard, slotted PVC well screen <br /> pipe aur unded by a stainless steel mesh. Prepacked scraonsehown wt. <br /> Sampling Sand is acked between the slotted PVC andAie <br /> Ac+:essor!es the stain ss steel mesh.Since the sand ispacked ound the slotted PVC before the well <br /> ASIM screen i installed, using prepacks guarantees <br /> Standards that san will be located directly around the <br /> well scr n. This makes well installtion quicker <br /> Publl;hecf and mor efficient than traditional methods. <br /> Research Read m re about Geoprobe®Prepack Advantages... <br /> Prepack Yell screens are available in two outside diameters... 1.4 inches OD (0.5 in. or <br /> 0.75 in. I )and 2.5 inches OD (1.0 in. or 1.5 in. ID). To install a monitoring well with these <br /> stage prepacks, probe rods are first driven to depth with a <br /> Geoprobe®brand percussion probing machine. The <br /> well assembly is then lowered into the probe rod <br /> !' 3 string with threaded PVC riser pipe.The small <br /> diameter prepack well screen assembly uses 0.5- <br /> ."':F ,, y inch Schedule g0 PVC riser pipe and is installed <br /> with 2.125-inch OD probe rods. The larger diameter <br /> -Z"' prepack well assembly uses 1.0-inch Schedule 40 <br /> PVC riser pipe and is installed with 3.25-inch OD <br /> probe rods. <br /> Close-t p of the annular seal at 9 feet <br /> b9s.Th re are no voids in the grout Once the well assembly is lowered to the bottom of <br /> and tho well casing remains cen- the probe rod string, the probe rods are retracted to <br /> tered u the annular space.(Blue a point above the screen. A sand barrier, installed <br /> scale fir inches) directly above the well screen, prevents grout from <br /> entering the screens.This barrier can be created <br /> either by natural formation collapse (occurring <br /> during t initial probe rod retraction) or by gravity installation of fine-grade sand through <br /> the rod a inulus. With the barrier in place,granular bentonite or bentonite slurry is then <br /> installed n the annulus to form a well seal. <br /> Geoprobe®Small Diameter Monitoring Well Benefits include: <br /> Q flok and simple installation. <br /> • <br /> Pi specked Screen designed with 20/40 grade environmental sand. <br /> http://www.geoprobe.conV roducts/tools/gw_nonitoring/well_-Xmenu.httn 1/29/2004 <br />