Laserfiche WebLink
01/29/2004 16:53 20952 7 GEOLOGICAL TEC&S PAGE 06 <br /> Gcoprobe® Groundwater Wring I Page 2 of 2 <br /> • <br /> Nd cuttings generated during installation. <br /> • Mets all requirements of a RCRA well with 'F <br /> e eption of the smaller diameter. <br /> • <br /> Pt rmanent monitoring well installation with a <br /> G oprobe®Machine. <br /> W all seal and grouting meet EPA and ASTM <br /> D 5092 method requirements. <br /> • M iimal disturbance of natural formation <br /> cc iditions. <br /> • C in be developed, purged, and sampled using <br /> in xpensive tubing check valve system. i <br /> • M flmal development and purge water <br /> gE nerated for sampling reducing time <br /> re juirements and disposal costs. <br /> • U es standard above-ground or flush-mount <br /> wi II protectors. <br /> • Siall diameter bladder pumps available for <br /> 1. -inch wells <br /> Copvrighl4?2003 Ke!!.Inc. <br /> http://www.geoprobe.com/ oducts/tools/gw_tnonitoring/well_menu.htm 1/29/2004 <br />