' Ceokv,xa[TecFtntcs Ync 0 • Page 5 <br /> Monitoring Well Installation Work Pian <br /> J M Equipment Co <br />' Project No 507 2 <br /> • January 17, I997 <br />' Detection Limits - aso ine <br /> ater <br /> 3.0 SCHEDULE & REPORTING <br />' Geological Technics Inc anticipates beginning field work no later than 30 days after work <br /> plan approval and upon issuance of the drilling permit The information gathered during this <br /> phase of work will be presented in a report which will include a summary of the geology as <br />' well as the results of sample analyses The project will be supervised by Dr Ray Kablanow, <br /> a registered professional geologist Copies of the report will be forwarded to both the <br /> appropriate County and State regulatory agencies (SCEHD and CRWQCB-CVR) <br /> I <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Techmcs Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This work plan was prepared by <br /> C3eologicafTechnics Inc <br /> Michael J Niemi <br /> Geologist <br /> Raynold I Kablanow II, Ph D <br /> California Registered Geologist #5234 <br /> IRegistered Environmental Assessor 9901 <br /> i <br />