Laserfiche WebLink
In-situ Chemical Oxidation <br /> as Station Site - Ob <br /> Former Recall G "ective <br /> J <br /> Dissolved MTBE, TBA, and TAME impact extended across more than 10 <br /> properties (dissolved-phase MTBE plume greater than 700ft in length). Numerous <br /> residential supply wells impacted with MTBE and TBA. RP needed a remedial <br /> solution that could obtain closure within one year of operation & within the <br /> remaining insurance coverage budget. Stringent TBA discharge limits were set for <br /> any prospective groundwater discharge (i.e. groundwater treatment was a costly <br /> remedial alternative). <br /> 15000 I _ «� e. j �i <br /> y---:.0 Pnw <br /> 10000 �- <br /> `' +1 <br /> 5000r ; t i I3 j`i ; 11 • <br /> 1000 _ _-' -� - - Dissolved ; I <br /> MTBE 4 <br /> 500 <br /> 180 I p <br /> I i <br /> 7E <br /> i0 100 200 (µ9/L) II 'f <br /> oI <br /> Scale(feet) -_— --r; r r t? •j SiRLE,�__ _ —�-- _ __ <br /> APPLIED PROCESS TECHNOLOGY, INC. <br /> i <br />