My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2004 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 11:39:42 AM
Creation date
3/7/2019 9:33:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2006
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Features <br />• High Flow Capacity — The primary poppet is held out of the flow stream while <br />the secondary poppet is held normally open to minimize head loss across the <br />valve and to protect the poppet seals from damage and erosion. True 1 1/2" and <br />2" body sizes ensure maximum flow. <br />• Fire Protection —A fusible link trips the valve closed at 165° F to shut off fuel <br />supply to the dispenser. <br />• Main Poppet Seat Integral to the Top Assembly — Having the main poppet seat as <br />an integral part of the valve top assures a new, clean seating surface is installed <br />each time the top is replaced. This design also ensures that the integrity of the <br />seal between the valve top and bottom is verified during line testing and allows <br />full inspection of the main poppet when the top is removed. <br />• Reliable Shut-off — A Stainless Steel Main Spring, a Teflon -Coated Brass Packing <br />Nut, and a Copper -Nickel -Chrome Plated Brass Stem are designed to prevent tar <br />build-up and corrosion from interfering with poppet operation after long periods <br />of normal service without activation. <br />• Integral Test Port — A 3/8" Test Port allows the piping system to be air tested <br />without breaking any piping connections. <br />• Patented Thermal Relief Valve — Relieves excessive pressure build-up caused by <br />thermal expansion of fuel in the dispenser piping system in the event of fire <br />(double -poppet models only). <br />• Low -Profile Tops — Female and Union -top double -poppet valves have a low - <br />profile top to allow upgrading from OPW single -poppet valves without changing <br />existing piping. <br />• Multiple Mounting Options — Valves are boss -mounted to stabilizer bars in sumps <br />and pans or mounted to bars embedded in the island with optional U -Bolt kits <br />IOUBK-015 (not included). Versatile Combination Body (boss mount/U-Bolt <br />mount) models are available to accommodate most mounting applications with <br />one valve style. <br />• Underwriters Laboratories — Listed for use with gasoline and 85% and 100% <br />methanol. All OPW 10 Emergency Shut -Off Valves meet requirements of UL <br />STANDARD 842. <br />• Duragard®-Coat Finish — Provides superior corrosion resistance. <br />Materials <br />Top: cast iron* <br />Body: cast iron* <br />Disc: M-19 <br />Carrier: zinc plated steel <br />Stem: copper -nickel -chrome plated brass <br />Poppet spring: stainless steel <br />Seal: M-19 O -rine <br />
The URL can be used to link to this page
Your browser does not support the video tag.