Laserfiche WebLink
Page Z of 3 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer N Industry Standard Q Professional Engineer <br />El Other (Specify) <br />Test Method Used: <br />N Pressure <br />El Other (Specify) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: DIAL GAUGE <br />Equipment Resolution: 0 to 15° psi <br />Piping Material: <br />ping Run # $7 <br />Piping Run # g <br />Piping Run # y/ Piping Run # Iq 7 <br />Fiberglass Fiberglass <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />o.0 <br />t v� ✓c c� <br />Piping Diameter: <br />3 <br />Length of Piping Run: <br />ISO <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Mi tes <br />15 Minutes <br />15 Minutes 15 Minutes <br />Test Start Time: <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />5 PSI 5 PSI <br />Test End Time: <br />1 7-.o e <br />/ 7 ; c Z) I ; q 2� <br />Final Reading (RF): <br />PSI <br />S PSI <br />5 PSI 5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF-RO: <br />SI <br />of PSI <br />52f PSI A�r PSI <br />Pass/Fail Threshold or <br />Criteria: <br />Zero <br />Zero <br />Zero Zero <br />3._.. <br />- _z <br />�_. <br />= <br />�a <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />.'``cik^Ac'-C2� Cu 00 C- <br />8 -7 <br />8-7 ,Pc -ss <br />BP Arco # 05469 <br />130 S. Wilson Way <br />Stockton, CA 95205 <br />N05245R-SB 989 Repair <br />