Laserfiche WebLink
Page 3 of 3 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: UDC Manufacturer ❑ Industry Standard ® Professional Engineer ❑ <br />Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br />Other (Specify) <br />Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br />Under -Dispenser Containment Number Below <br />7zn <br />anufacturer: <br />aterial: <br />_ <br />UDC Depth: <br />! ? " <br />-13 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of LDDC prior to <br />testing: <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />Portion of UDC Tested' <br />Penetration <br />Penetration <br />Penetration <br />Penetration <br />Does turbine shut down when <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />UDC sensor detects liquid. <br />Turbine shutdown response time <br />❑ Yes ❑ No NAM <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NA® <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NAM <br />Was fail-safe verified to be <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />starting test <br />Test Start Time: <br />-. T- 3 L = S Y <br />Initial Reading (RO: <br />- 1214- //. 7C7 Y <br />Test End Time: <br />: 5 I P." 13 <br />Final Reading (RF): <br />3- i 2 Z 7 11.76 Z 6 <br />Test Duration: <br />15 Min 15 Min <br />15 Min <br />15 Min <br />15 Min 15 Min <br />15 Min 15 Min <br />Change in Reading (RF-Rj): <br />._OCe�S7 "0'00.4, <br />Pass/Fail Threshold or Criteria: <br />-0.0020 -0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />t5Z 7 - <br />Yes ❑ No NAE] <br />Was sensor removed for testing? <br />19.,Yes ❑ No NAD <br />❑ Yes ❑ No NAD <br />❑ Yes ❑ No NA❑ <br />Was sensor properly replaced and <br />(Yes El No NA❑ <br />❑Yes El No NA❑ <br />E] Yes E] No NA[] <br />E] Yes El No NA❑ <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />BP Arco # 05469 <br />130 S. Wilson Way <br />Stockton, CA 95205 <br />N05245R-SB 989 Repair <br />