Laserfiche WebLink
UNDERGROU_ STORLGE TANK MONITORLNG SYSTEJ. LRTIFICATIOlti <br />F. In-Tanh Gauging / SIR Equipment: Permit Number: <br />❑ Check this box_ if tank gauging is used only for inventory control <br />❑ Check tais box if no tank mu-_= o_ SIP, equipment is installed <br />This section must be completed if in-taiah gauging equipment is used to perform leak detection monitorinc,. <br />rmmnlafP fhe fnlinwino checklist: <br />Cl Yes <br />❑ _ * <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults <br />❑ Yes <br />❑ No* <br />W ere all tank gauging probes visually inspected for damage and residue buildup? <br />11 ❑ Yes <br />I ❑ .No* <br />I INaccuracy of system product level readings tested? <br />❑ Yes <br />❑ No <br />Was a uracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all ppbes reinstalled properly?=' <br />❑ Yes <br />❑ No* <br />Were all itriN on the equipment manufacturer's mainten7 e checklist completed? <br />* In Section H below, describe hog d when these deficiencies were yVwill be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if s are not installed. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />pment certincation, was a leak simulated to verify LLD performance'?❑ <br />For equipment start-up orVdIe <br />N/A <br />(Check all that apply) Simate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; . ❑ 0.2 g.p.h. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed ope tion and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus pp6perly tali ted? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, d s. the LLD res tri roduct flow if it detects a leak? <br />❑ NIA <br />❑ Yes <br />❑ No* <br />For electronic LLD,, does .the turbine automatic y shut off if the LLD detects a leak? <br />❑ NIA <br />f _. <br />❑ Yes <br />❑ No* <br />For electronic L/LDs, does the turbine automatically t off if any portion of the monitoring. system is disabled <br />❑ NIA <br />or disconnected? <br />❑ 'Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off any portion of the monitoring system malfunctions <br />❑ NIA <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been ' uallyinspected? <br />❑ NIA <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist compldted? <br />* In Section H below,-describe:hovi, and when these deficiencies were or will be corrected. <br />11. Comments: <br />DEH:HM.93o1,(IteV 08/02). ;' :: Page 3 of 4 County of San Diego -DEH -Hazardous Materials Division, <br />