My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 2004 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 11:39:42 AM
Creation date
3/7/2019 9:33:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2006
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page %A of I <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Wayne Perry Inc. <br />Equipment Resolution: .0007" <br />Sump # 7 <br />Sump # r <br />Sump # f/ <br />Sump # <br />Sump Diameter: <br />yam" <br />Sump Depth: y y " <br />l <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />„ <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />„ <br />Condition of sump prior to testing: cs,.., <br />t•Lw.� <br />�c,,� <br />Portion of Sum Tested 2" ABOVE HIGHEST <br />Sump PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />2" ABOVE HIGHEST <br />PIPING PENETRATION <br />Does turbine shut down when <br />sump sensor detects liquid (both ❑ Yes ❑ No ® NA <br />product and water)?' <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time NA <br />NA <br />NA <br />Is system programmed for fail-safe ❑ Yes ❑ No ® NA <br />shutdown?* <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Was fail-safe verified to be ❑ yes ❑No ® NA <br />operational?* <br />❑ Yes ❑No ®NA <br />❑ Yes ❑No ® NA <br />❑ Yes ❑ No ® NA <br />Wait time between applying <br />pressure/vacuum/water and starting 15 Minutes <br />test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: /7 O <br />17207 <br />t 7 s c7 <br />Initial Reading (RO: 6_ 7e)O7 <br />i7 C45 -/G <br />/ <br />Test End Time: /2.575 <br />f 7 ; 7'L <br />Z; 21Z <br />Final Reading (RF): �?3 <br />,2.cf6s <br />,9'1V I, <br />Test Duration: 15 Min <br />15 Min <br />15 Min 15 Min <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />Change in Reading (RF-RO: , 0,00/:/ <br />ocv/ si <br />✓cit' ?% <br />Pass/Fail Threshold or Criteria: -0.0020 <br />-0.0020 <br />-0.0020 -0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />-0.0020 <br />TQst �I= <br />AM-- <br />_"alit <br />Was sensor removed for testing? W Yes ❑ No ❑ NA <br />RrYes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and WYes ❑ No ❑ NA <br />verified functional after testin ? <br />Eff Yes ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />BP Arco # 05469 <br />130 S. Wilson Way <br />Stockton ,CA 95205 <br />N05245 -SB 989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.