Laserfiche WebLink
Page -) of / <br />7. UNb_ DISPENSER CONTAINMENT (UDC, _ ESTING <br />Test Method Developed By: UDC Manufacturer ❑ Industry Standard N Professional Engineer ❑ <br />Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic N <br />Other (Specify) <br />Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br />Under -Dispenser Containment Number Below <br />- 3- S-� •�-�- 9-,v it-tZ t3-,�[ rs-l6 <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />13 " <br />13 ` <br />t3 <br />/ <br />Height from UDC Bottom to Top <br />c <br />05 <br />u <br />of Highest Piping Penetration: <br />02-1 <br />Height from UDC Bottom to <br />u <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested' <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />Penetration <br />Penetration <br />Penetration <br />Penetration <br />Does turbine shut down when <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />UDC sensor detects liquid. <br />Turbine shutdown response time <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NAN <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NAN <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />starting test <br />Test Start Time: <br />Z ;,^,'J Z ; co <br />-2, 3 3 7- ` ,3 -3 <br />Initial Reading (RI): <br />11, /1,7/f rz..174o./k-/9E <br />12, 3 /L <br />/Z /77 / J77 <br />Test End Time: <br />-Z : 14 <br />7 : -Yf x <br />/: 7 9 ; 217 <br />Final Reading (RF): <br />1.3-14713 /1.3762c <br />44 S 1Z, .3915 <br />/1. /7 ftf' <br />Test Duration: <br />15 Min 15 Min <br />15 Min 15 Min <br />15 Min 15 Min <br />15 Min 15 Min <br />Change in Reading (RF-Ri): <br />,,Crm5 . vec,/3 <br />. wrV% CC,,C, 3 c) <br />'COVOO •DO-Oa0 <br />Passs//FaaiiKl(Thrreshold or Criteria: <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />Y• <br />Was sensor removed for testing? <br />❑ Yes ❑ No NAE] <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ No NAD <br />❑ Yes ❑ No NAE] <br />Was sensor properly replaced and <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ No NA[] <br />❑ Yes ❑ No NA❑ <br />verified functional after testing? <br />Comm nts — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />BP Arco # 05469 <br />130 S. Wilson Way <br />Stockton ,CA 95205 <br />N05245 -SB 989 Testing <br />