Laserfiche WebLink
er.1 L-doc 3 9810 <br /> ac� <br /> This template constitutes the SPCC Plan for the facility,when completed and signed by the owner or operator of a <br /> facility that meets the applicability criteria in§112.3(g)(1).This template addresses the requirements of 40 CFR part 112. <br /> Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or for a <br /> facility attended fewer than four hours per day, at the nearest field office.When making operational changes at a facility <br /> that are necessary to comply with the rule requirements, the owner/operator should follow state and local requirements__ <br /> (such as for permitting, design and construction)and obtain professional assistance, as appropriate. <br /> Facility Description <br /> Facility Name .1 o <br /> Facility Addresses <br /> City State <br /> County �Zoll Tel. Number - „;.D <br /> Owner or Operator Name <br /> Owner or Operator Address <br /> City State ZIP <br /> County Tel. Number ( ) - <br /> 1. Self-Certification Statement(§112. (a)(1)) <br /> The owner or operator of a facility certifies that each of the following is true in order to utilize this template to comply <br /> with the SPCC requirements: <br /> I certify that the following is accurate: <br /> I. <br /> I m familiar ith a applicable requirements of part 112; <br /> . I have visited and examined the facility. <br /> . This Plan was prepared in accordance with accepted and sound industry practices and standards; <br /> 4. Procedures for required inspections and testing have been established in accordance with industry inspection <br /> and testing standards or recommended practices; <br /> 5. 1 will fully implement the Plan; <br /> 6. This facility meets the following qualification criteria(under§112.3(g)(1)): <br /> a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br /> b. The facility has had no single discharge as described in§112.1(b)exceeding 1,000 U.S. gallons and no <br /> two discharges as described in 112.1(b)each exceeding 42 U.S. gallons within any twelve month period <br /> in the three years prior to the SPCC Plan self-certification date, or since becoming subject to 40 CFR part <br /> 112 if the facility has been in operation for less than three years(not including oil discharges as described <br /> in§112.1(b)that are the result of natural disasters, acts of war, or terrorism); and <br /> c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 <br /> U.S. gallons. <br /> 7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by§112.7(a)(2)(environmental <br /> equivalence)and§112.7(d) (impracticability of secondary containment)or include any measures pursuant to <br /> 112.9(c)(6)for produced water containers and any associated piping; <br /> 8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and I <br /> have committed the necessary resources to fully implement this Plan. <br /> Facility Name: _ % Pae 1 <br /> 9 Tier I Qualified Facility SPCC Pian <br />