My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
107
>
2200 - Hazardous Waste Program
>
PR0505919
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 12:58:01 PM
Creation date
3/20/2019 10:35:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505919
PE
2220
FACILITY_ID
FA0007083
FACILITY_NAME
B & C PAINTING SOLUTIONS INC
STREET_NUMBER
107
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95206
APN
19337005
CURRENT_STATUS
01
SITE_LOCATION
107 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0505919_107 VAL DERVIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ver.1-L-aoc-3-1v-1v <br /> I also understand my other obli tions relating to the storage of oil at this fa-iuh, including, among others: <br /> 1 'W <br /> 1. To report any oil discharge to navigable waters or adjoining shorelines to the appropriate authorities. Notification <br /> information is included in this Plan. <br /> 2. To review and amend this Plan whenever there is a material change at the facility that affects the potential for an <br /> oil discharge, and at least once every five years. Reviews and amendments are recorded in an attached log [See <br /> Five Year Review Log and Technical Amendment Log in Attachments 1.1 and 1.2.] <br /> 3. Optional use of a contingency plan.A contingency plan: <br /> a. May be used in lieu of secondary containment for qualified oil-filled operational equipment, in accordance <br /> with the requirements under§1 12.7(k), and; <br /> b. Must be prepared for flowlines and/or intra-facility gathering lines which do not have secondary <br /> containment at an oil production facility, and; <br /> c. Must include an established and documented inspection or monitoring program; must follow the provisions <br /> of 40 CFR part 109; and must include a written commitment of manpower, equipment and materials to <br /> expeditiously remove any quantity of oil discharged that may be harmful. If applicable, a copy of the <br /> contingency plan and any additional documentation will be attached to this Plan as Attachment 2. <br /> 1 certify that I have satisfied the requirement to prepare and implement a Plan under§112.3 and all of the requirements <br /> under§112.6(a). I certify that the information contained in this Plan is true. <br /> Title: 4�WI120161av <br /> Signature----'�' <br /> Name Date: 20 <br /> 111. Record of Plan Review and Amendments 01 <br /> Five Year Review(§112. O): <br /> Complete a review and evaluation of this SPCC Plan at least on every live years.As a result of the review,amend this Plan <br /> within six months to Include more effective prevention and control measures for the facility,if applicable. Implement any SPCC Plan <br /> amendment as soon as possible,but no later than six months following Plan amendment. Document completion of the review and <br /> evaluation,and complete the Five Year Review Log in Attachment 1.1. If the facility no longer meets Tier I qualified facility eligibility,the <br /> owner or operator must revise the Plan to meet Tier 11 qualified facility requirements,or complete a full PE certified Plan. <br /> This SPCC Plan will be amended when there is a change in the facility design, construction,operation, or <br /> maintenance that materially affects the potential for a discharge to navigable waters or adjoining shorelines. <br /> Examples include adding or removing containers, reconstruction, replacement or installation of piping <br /> systems, changes to secondary containment systems, changes in product stored at this facility, or revisions to <br /> standard operating procedures. <br /> Any technical amendments to this Plan will be re-certified in accordance with Section I of this Plan template. <br /> [§112-6(@)0[See Technical Amendment Login Attachment 1.2 <br /> Facility Name:9;�7jre Page 2 Tier I Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.