My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:36:02 AM
Creation date
3/20/2019 11:10:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br />APPENDIX C-6 <br />OVERFILL <br />OPERATION INSPECTION <br />Facility Name: <br />Owner: <br />Address: <br />Address: <br />City, State, Zip Code: <br />City, State, Zip Code: <br />Facility I.D. #: <br />Phone #: <br />Testing Company: <br />Phone #: <br />Date: <br />This procedure is to determine whether the high level alarm is operational and will trigger when the tank is no more than 90% full. <br />See PEI/RP1200 Section 7.3 for the inspection procedure. This procedure is applicable to tank level monitor stems that touch the <br />bottom of the tank when in place. <br />Tank Number <br />Product Stored <br />Tank Level Monitor Brand and Model <br />1.Tank Volume, gallons <br />2.Tank Diameter, inches <br />3. Overfill alarm activates in the test mode at the <br />console? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />[]Yes ❑ No <br />4. When activated, overfill alarm can be heard or <br />seen while delivering to the tank? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />5. After removingthe probe from the tank, it has <br />been inspected and any damaged or missing <br />parts replaced? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />[]Yes ❑ No <br />6. Float moves freely on the stem without binding? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />7. Moving product level float up the stem trigger <br />alarm? <br />❑Yes ElNo <br />El Yes ElNo <br />El Yes E3No <br />El Yes ElNo <br />8. Inch level from bottom of stem when 90% alarm <br />is triggered. <br />9. Tank volume at inch level in Line 8. <br />10. Calculate (Line 9 / Line 1) x 100 <br />11, Is Line 10 less than 90%? <br />❑ Yes ❑ No <br />[]Yes ❑ No <br />[]Yes ❑ No <br />❑ Yes ❑ No <br />12. Fuel float level on the console agrees with the <br />gauge stick reading? <br />❑ yes ❑ No <br />[]Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes No <br />13. Overfill alarm activates at any product level <br />above 90% tank capacity? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />FEI Yes ❑ No <br />If any answers in Lines 3, 4, 5, 6, 7 or 11 are "No," or Line 13 is "Yes," the system has failed the test. <br />Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments: <br />Tester's Name (print) <br />Tester's Signature <br />pei.org 4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.