My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:53:50 PM
Creation date
3/20/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of I <br /> These steps are not a substitute for the detailed <br /> installation steps contained in the following pages. <br /> DO NOT ATTEMPT TO INSTALL THIS PRODUCT BASED <br /> ONLY ON THE SUMMARIZED STEPS LISTED ON THIS PAGE <br /> 1) Read the entire manual front to back, read carefully. Do not just view images. <br /> 2) Evaluate the sump, ensure sump material is FRP or steel, and the piping is FRP or conduit. <br /> 3) Remove any necessary components that will obstruct your access to the sump wall. <br /> Excavate adequate area on outside of all fittings you will install. <br /> 4) Clean each sump. Remove all contaminants, water and debris. Ensure each sump <br /> will be completely dry during all installation steps. <br /> 5) Secure conduit endpoints so they do not move or act as a lever. <br /> 6) Remove the interior boot and all of it's components or sealants from the wall and pipe. <br /> 7) Push existing bolts back into the backfill. Do not damage the sump wall doing this. <br /> 8) Properly protect the pipe or conduit against damage. <br /> 9) Abrade the interior of sump wall around hole until bare fiberglass is shown. <br /> 10) Clean, dry and rough up pipe or conduit surface in preparation for bonding. <br /> 11) Dust off all abraded surfaces with compressed air. <br /> 12) Dry-fit your fittings for clean fit against the wall and piping. Mark alignment stripe <br /> across the fitting halves and the sump wall with a permanent marker. <br /> 13) Bond split fitting to the interior of sump by manually pressing fitting halves <br /> firmly against the sump wall using hand strength. <br /> 14) Bead excess epoxy around primary seam at the wall and at the pipe. <br /> 15) Use acetone to clean the face of each fitting to look like a new install. Clamp halves <br /> together tight and re-clean any epoxy that oozes. <br /> 16) Allow epoxy to fully cure before testing fitting installation. Do not disturb while curing! <br /> 17) Mandatory Pressure/soap test to verify the fitting installation is good. <br /> 6 ii-F-Series-Retrofit-S-15A <br />
The URL can be used to link to this page
Your browser does not support the video tag.