Laserfiche WebLink
SCOPE OF WORK <br /> TANK AND PIPING INSTALLATION <br /> Page 2 of 2 <br /> 14. Contractor shall furnish all pipe, valved, and fittings to complete this <br /> work including new drop tubes. <br /> 15. Contractor shall furnish and install Pomeco Mod 111 round fill boxed over <br /> till and 12 round fill boxed over vapor risers. Also furnish 4" O.P.W. 61 <br /> adapter with 62TT locking cap and 3" O.P.W. 1611 adapter with 1711 TK-3 caps. <br /> 16. re <br /> ^Existing steel tanks to bemoved by General Contractor and shall become <br /> his salvage. Tanks to be removed in accordance with local fire and county and j <br /> city ordinances and Filass tanks togbe rret ained byn ARForm No.owner removing3 before <br /> aud deliveredtoo <br /> tanks from site. Z �bergg <br /> owners storage in Sacremento, Ca. <br /> ng disturbed by this work shall be replaced by this <br /> 17. All concrete and ac pavi <br /> Contractor and be guaranteed for 1 year. <br /> 18. No work to begin until notified by Owners representative. k <br /> lg. Owner to retain used turbines. <br /> Deliver to owners storage in Sacremento, Ca. <br /> 20. This is a complete tank and product line replacement. <br /> iCoatractor tingwill. uswithealed <br /> Thread Pipe or approved equal. Contractoragree <br /> sales representative and engineer to discuss construction start and schedule <br /> during construction in order that all will have an understanding of proceedures taking ' <br /> place. . . . . it <br /> r_ <br /> I <br />