My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by <br /> �y <br /> BP West Coast Products LLC <br /> 4 Centerpointe Drive <br /> La Palma,CA 90623 <br /> G°3C E0W!=,Iry <br /> C' <br /> DEC 2 9 2004 <br /> December 16, 2004 <br /> ENVIRONMENT fiLA <br /> Designated UST Operator Program PERMIT/SERU►C!5 <br /> County of San Joaquin <br /> Environmental Health Division <br /> 304 E. Wever Ave., 3`d Floor <br /> Stockton, CA 95202 <br /> Re: ARCO Facility Number 00595 <br /> 6100 Highway 99 <br /> Stockton, CA 95212 <br /> On behalf of BP West Coast Products LLC (BP), the owner of the underground storage <br /> tanks (USTs) at the subject facility, I hereby make the following representations. BP <br /> understands the underground storage tank (UST) requirements applicable to the subject <br /> facility. I have personally reviewed the results of the following: <br /> • Monitor Certification conducted December 16,2004 <br /> • Compliance Survey conducted November 18, 2004 <br /> • Closure of issues identified by the Compliance Survey on November 18, 2004 <br /> Based on that review I believe that BP was in compliance with the applicable UST <br /> requirements on December 16, 2004. Furthermore, I am unaware of any information <br /> that would cause me to believe that such statement is no longer appropriate. <br /> BP will supplement this statement by January 1, 2005 with the name of the designated <br /> UST operator for this facility. <br /> Si erely, <br /> tL' <br /> Jo Schetter��'`-� <br /> E ronmental Compliance Specialist <br /> BP West Coast Products LLC <br /> Compliance &Assurance <br />
The URL can be used to link to this page
Your browser does not support the video tag.