My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'64.k6' M 'tor Certification Inspection <br /> "ARCO Products Company <br /> This letter certifies that the monitor(s) is/are in place, the probes are in correct position and the system <br /> is operating properI . <br /> Station # Date �� <br /> Address K•1670 At, 99 Type Inspe do <br /> _ 1 Annual Permit <br /> Recheck Leak <br /> Type & Model of Monitor Le -f r e,__4` > " <br /> System Function <br /> Tanks Annular Space In Tank <br /> Pass Fail N/A Pass Fail N/�j, <br /> Regular � _� _1� <br /> Midgrade _ <br /> Supreme <br /> Waste Oil <br /> Other 'F7 5/av-c- <br /> Product Lines Turbine Sump In-Line Fill Sump <br /> P, s Fail N/A Pass Fail N/A Pass Fail N/A <br /> Regular 7� <br /> Midgrade �- —x <br /> Supreme <br /> Waste Oil <br /> Other <br /> When monitor is turned off or in alarm, is there positive shutdown of turbines? Yes No <br /> If No, were precision product line tests performed? Yes No <br /> Monitor Panel <br /> Is the monitor panel mounted and labeled correctly? <br /> Does monitor alarm horn function properly? <br /> r <br /> Is panel accessible and visible to station personnel? Q j <br /> Replaced all failed probes? Yes No N/A <br /> If No, probes to be replaced/repaired by (Date) <br /> 4/ e�r nQ s e%1 S co T.S q S S <br /> r <br /> Inspected By: Contractor <br /> Technician <br /> Signature <br /> APC-3324(8/96) \ <br />
The URL can be used to link to this page
Your browser does not support the video tag.